Site Final | 4/2/2010 | 4/2/2010 | 4/2/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 4/2/2010 | 4/2/2010 | 4/2/2010 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 3/31/2010 | 3/31/2010 | 3/31/2010 | P | PASS |
Dave Hannah
|
|
|
r t f
|
Random Inspection | 5/22/2009 | 5/22/2009 | 5/22/2009 | A | PASS |
Steven Webb
|
|
|
Met with Mike J. & Clint S. House rehab's rear footing formed right on irrigation canel. Mike informed RP to be very careful while placing concrete, washout of risidual will take place inside onsite dumpter.
|
Random Inspection | 5/22/2009 | 5/22/2009 | 5/22/2009 | A | PASS |
Mike Jordan
|
|
|
Spoke with RP regarding conc. placement. Due to proximity of canal, extra care needs to be taken when placing conc.
|
Site Preparation | 4/30/2009 | 4/30/2009 | 4/30/2009 | | PASS |
Clint A Smith
|
|
|
|