Site Final | 8/25/2009 | 8/26/2009 | 8/26/2009 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/26/2009 | 8/26/2009 | 8/26/2009 | P | PASS |
Mike Jordan
|
|
|
Di protection has been removed.
|
Site Final | 8/25/2009 | 8/25/2009 | 8/25/2009 | A | FAIL |
Mike Jordan
|
|
|
Needs to pull di protection. Called RP to notify him. Will reinspect tommorow.
|
Random Inspection | 7/15/2009 | 7/15/2009 | 7/15/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
Tracking Control | 6/16/2009 | 6/17/2009 | 6/17/2009 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 6/16/2009 | 6/16/2009 | 6/16/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: CLean up all tracking off of Irving onto Maple Grove. Will re-inspect on 6/17/09 AM.
|
General Inspection | 6/3/2009 | 6/3/2009 | 6/3/2009 | P | DONE |
Clint A Smith
|
|
|
Message with RP: Questioned the RP on what type of stabilization will be occuring and when the process will be implimented.
|
Site Preparation | 5/13/2009 | 5/18/2009 | 5/18/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/13/2009 | 5/13/2009 | 5/13/2009 | | NR |
Clint A Smith
|
|
|
No demo has occured yet.
|