Site Final | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | PASS |
Tony Young
|
|
|
|
Random Inspection | 6/16/2009 | 6/16/2009 | 6/16/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/1/2009 | 6/2/2009 | 6/2/2009 | A | PASS |
Jim Sly
|
|
|
|
Site Preparation | 6/1/2009 | 6/1/2009 | 6/1/2009 | P | CANC |
Jim Sly
|
|
|
Re-sched.....
|
General Inspection | 6/1/2009 | 6/1/2009 | 6/1/2009 | A | PASS |
Bob Reichert
|
|
|
looked ok, saw sign and container
|
BMP Violation | 5/19/2009 | 5/25/2009 | 5/26/2009 | A | PART |
Clint A Smith
|
|
|
Once all wood debris is removed a trash container will be required.
|
Site Preparation | 5/19/2009 | 5/19/2009 | 5/19/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to contractor (RP on vacation) 1. Provide a trash container. 2. Clean up all concrete spoil piles.
Will re-inspect on 5/25/09 AM.
|