Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberESC09-00240
StatusFinaled
Name RUSTIN RAY
Site Address 2064 S STONYFIELD PL
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/14/20106/14/20106/14/2010PPASS
DetailsMike Jordan
DOC - Permit Finaled6/14/20106/14/20106/14/2010PPASS
DetailsMike Jordan
Final stabalization is now completed.
Site Final8/18/20098/18/20098/18/2009PFAIL
DetailsMike Jordan
70% reveg. not achieved.
General Inspection8/18/20098/18/20098/18/2009PPASS
DetailsBob Reichert
looked ok, not done
Random Inspection8/12/20098/12/20098/12/2009PPASS
DetailsMike Jordan
BMP Violation8/7/20098/10/20098/10/2009APASS
DetailsEric Strole
BMP Violation8/5/20098/7/20098/7/2009PFAIL
DetailsEric Strole
left verbal & written correction with rp to complete previous correction by days end or a stop work will be issued. no corrections from previous correction have been made.
Random Inspection8/5/20098/5/20098/5/2009PFAIL
DetailsEric Strole
Left verbal correction with rp to clean up all trash, gutter pans, dirt & debris off all hard surfaces & maintain DI boxes by 8-7-09 am. Will reinspect 08-07-09 pm.
General Inspection7/31/20097/31/20097/31/2009PPASS
DetailsBob Reichert
looked ok
BMP Violation7/7/20097/7/20097/7/2009PPASS
DetailsMike Jordan
TRash was picked up.
Random Inspection7/6/20097/6/20097/6/2009PPART
DetailsMike Jordan
Needs to clean up const. debries or provide an approved receptacle. RP was notified.
BMP Violation6/17/20096/19/20096/19/2009APART
DetailsClint A Smith
made an effort on cleaning out d.i.
General Inspection6/17/20096/17/20096/17/2009PCANC
DetailsClint A Smith
Verbal to RP:
Maintain storm drain ilet after next set of storms today. Will re-inspect on 6/19/09AM.
Site Preparation6/10/20096/10/20096/10/2009 FAIL
DetailsJack Frank
corr posted met R/P explained requirements, shall clean hard surfaces, placement of bmps, trash container when needed, placement of port-a-pot, forgot to note concrete washout, protect for storm drains, Clint I hope I did this the right way, never done site prep Jack
Site Preparation6/4/20096/4/20096/4/2009APASS
DetailsMike Jordan