Site Final | 6/2/2009 | 6/12/2009 | 6/8/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/20/2009 | 5/20/2009 | 5/20/2009 | | PASS |
Clint A Smith
|
|
|
Discussed with RP over how to reach an approved site final on the demo permit. Once complete with stabilizing to contact either I or the city to schedule out a "site final" inspection.
|