Site Final | 9/14/2009 | 9/15/2009 | 9/14/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 9/14/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 9/14/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 5/27/2009 | 5/27/2009 | 5/27/2009 | A | PART |
Jim Sly
|
|
|
Talked to Gene (RP).......Need separate washout pit.....can make a depression in excavated dirt to contain wash. Do not washout in Bldg excavated area.
|
Site Preparation | 5/20/2009 | 5/20/2009 | 5/20/2009 | | PART |
Clint A Smith
|
|
|
Message to home owner: Need to provide a concrete washout pit prior to pour of concrete. Sign is visable from the street now.
|
Site Preparation | 5/15/2009 | 5/15/2009 | 5/15/2009 | A | FAIL |
Jim Sly
|
|
|
Need to move sign to where it's visible from street.
|