Site Final | 2/5/2010 | 2/5/2010 | 2/5/2010 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization is completed.
|
BMP Violation | 1/19/2010 | 1/19/2010 | 1/19/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 1/15/2010 | 1/15/2010 | 1/15/2010 | P | PART |
Mike Jordan
|
|
|
Needs to sweep sidewalks and gutter pan. Verbal c/n given to RP on site.
|
Random Inspection | 1/14/2010 | 1/14/2010 | 1/14/2010 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 1/5/2010 | 1/5/2010 | 1/5/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 12/30/2009 | 12/30/2009 | 12/30/2009 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 12/7/2009 | 12/7/2009 | 12/7/2009 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 12/1/2009 | 12/1/2009 | 12/1/2009 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 11/25/2009 | 11/27/2009 | 11/27/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/25/2009 | 11/25/2009 | 11/25/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a sediment barrier along the front of the lot. Will re-inspect on 11/27/09AM.
|
BMP Violation | 11/25/2009 | 11/25/2009 | 11/25/2009 | A | PASS |
Mike Jordan
|
|
|
All silts have been swept.
|
BMP Violation | 11/25/2009 | 11/25/2009 | 11/25/2009 | A | CANC |
Mike Jordan
|
|
|
|
Random Inspection | 11/24/2009 | 11/24/2009 | 11/24/2009 | P | PART |
Mike Jordan
|
|
|
Needs to remove all silts from hard surfaces. RP notified verbal c/n.
|
Random Inspection | 11/23/2009 | 11/23/2009 | 11/23/2009 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 11/18/2009 | 11/19/2009 | 11/19/2009 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 11/18/2009 | 11/18/2009 | 11/18/2009 | A | CANC |
Mike Jordan
|
|
|
|
Site Preparation | 11/18/2009 | 11/18/2009 | 11/18/2009 | A | CANC |
Mike Jordan
|
|
|
|