General Inspection ESC | 5/28/2010 | 5/28/2010 | 5/28/2010 | | DONE |
Clint A Smith
|
|
|
Work completed.
|
DOC - Permit Finaled | 5/28/2010 | 5/28/2010 | 5/28/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/29/2009 | 5/29/2009 | 6/1/2009 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/27/2009 | 5/27/2009 | 5/27/2009 | A | PASS |
Steven Webb
|
|
|
Informed contractors the importance of keeping the concrete out of the pond during the placement portion of the job.
|
Site Preparation | 5/26/2009 | 5/26/2009 | 5/26/2009 | P | NR |
Steven Webb
|
|
|
Project has not started; Reviewed major issued with Wendy, including, concrete placement is critical to keep residual out of the water. Need to post sign prior to starting work.
|