Site Final | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | PASS |
Jim Sly
|
|
|
OK
|
DOC - Permit Finaled | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 3/9/2010 | 3/9/2010 | 3/9/2010 | P | FAIL |
Jim Sly
|
|
|
Need to complete landscaping.
|
Random Inspection | 7/22/2009 | 7/22/2009 | 7/22/2009 | A | PART |
Eric Strole
|
|
|
spoke with rp about sweaping dirt & debris off all hard surfaces at the end of each day, also stock pile is going to be moved to lot north of site for top soil.
|
Site Preparation | 7/9/2009 | 7/10/2009 | 7/10/2009 | A | PART |
Jim Sly
|
|
|
Dennis phone...........Need to replace sign at concrete wash out area.......and use washout pit. Everything else OK.
|
Site Preparation | 7/8/2009 | 7/9/2009 | 7/9/2009 | A | NR |
Jim Sly
|
|
|
Dennis phone.....Re-Sched......
|