Site Final | 5/5/2010 | 5/5/2010 | 5/5/2010 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 5/5/2010 | 5/5/2010 | 5/5/2010 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 5/4/2010 | 5/4/2010 | 5/5/2010 | P | PASS |
Jim Sly
|
|
|
Dennis phone
|
DOC - Permit Finaled | 5/5/2010 | 5/5/2010 | 5/5/2010 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 11/2/2009 | 11/2/2009 | 11/2/2009 | A | PASS |
Jim Sly
|
|
|
OK
|
Random Inspection | 7/23/2009 | 7/23/2009 | 7/23/2009 | P | PART |
Jim Storey
|
|
|
|
Site Preparation | 7/22/2009 | 7/22/2009 | 7/22/2009 | P | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. All BMP's in place. Also noted conc. washout in place. Excavated material on site is being hauled today as per contractor.
|