Permit Information
Permit NumberESC09-00352
StatusFinaled
Name JAYLEN R WALKER
Site Address 3301 E WARM SPRINGS AVE
Project NameMarianne Williams Park
Customer Number 
ePlanReview 
Description
Permit for development only, does not include vertical construction.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled7/9/20147/9/20147/9/2014PPASS
DetailsAndy J. Long
Site Final7/9/20147/9/20147/9/2014PPASS
DetailsAndy J. Long
Confirmed with Brighton Corp that no further work will be performed within the initial permitted boundaries of this permit Marriane Williams Park. Any new work will be on seperate parcels with new plans submitted and permits. City of Boise ESC permit conditions satisfied. As mentioned in activity the Walling Creek Corridor wetland project CGP is still active.
General Inspection7/2/20147/2/20147/2/2014 PASS
DetailsAndy J. Long
General Inspection6/17/20146/17/20146/17/2014 PASS
DetailsAndy J. Long
No changes to site. No violations. Brighton's CGP #IDR12BJ34 is still open. City of Boise CGP has been terminated. Will continue to monitor. It is noted that any new development west of the park along Barber Station will need new permits.
General Inspection6/2/20146/2/20146/2/2014 PASS
DetailsAndy J. Long
No new recent acitivity. The excavation observed in wetlands in January/February was prep to plant native wetland trees, which have now been planted.
General Inspection5/16/20145/16/20145/16/2014 PASS
DetailsAndy J. Long
No new activity. Small stockpiles from River Heights still on site for future use.
General Inspection5/1/20145/1/20145/1/2014 PASS
DetailsAndy J. Long
No changes Marianne Williams park. Need to get with Brighton and close this permit and prepare for next phases to the west of the park.
General Inspection4/16/20144/16/20144/16/2014 PASS
DetailsAndy J. Long
No activity. No further preparations planned development to the west of the park.
General Inspection4/1/20144/1/20144/1/2014 PASS
DetailsAndy J. Long
No new activity or changes.
General Inspection3/17/20143/17/20143/17/2014 PASS
DetailsAndy J. Long
No recent acitivity. Brighton Corp stockpile is still in place. No corrections required.
General Inspection2/28/20142/28/20143/4/2014 PASS
DetailsAndy J. Long
No new activity. No violations observed.
General Inspection2/13/20142/13/20142/13/2014 PASS
DetailsAndy J. Long
No recent activity. No track out to Barber Valley. Brighton is stockpiling dirt on parcel adjacent to park south of the road. Permission was granted under this permit, but any new site work will need new permits, as scheduled work is not in scope of work on this ESC permit. Work is tentatively scheduled for this spring.
Tracking Control1/29/20141/29/20141/29/2014PPEND
DetailsAndy J. Long
Trackout from stockpiling was swept up as requested. Barber Valley Road is now clean.

Disposition is pending due to investigating if location of stockpile is on a permitted parcel.
Tracking Control1/23/20141/23/20141/23/2014PFAIL
DetailsAndy J. Long
Top soil from River Heights #being unloaded at parcel adjacent to park. Loading operation has cause track out to Barber Valley Drive.

Con call with Brighton Corp. resulted in them agreeing to sweep today and after loading is complete tomorrow. Will continue to monitor situation.

General Inspection1/13/20141/13/20141/13/2014 PASS
DetailsAndy J. Long
No violations. Brighton CGP for park and Walling Creek corridor is still active. Will keep ESC open while CGP is active.
General Inspection12/27/201312/27/201312/27/2013 PASS
DetailsAndy J. Long
General Inspection12/12/201312/12/201312/12/2013 CANC
DetailsAndy J. Long
No changes in project status.
General Inspection11/27/201311/27/201311/27/2013 PASS
DetailsAndy J. Long
No changes since prior inspection. BPR has closed its NOI on the Park construction; Brighton has NOI active for Walling Creek Corridor which is still in process of stabilization. CGP # IDR12BJ34
General Inspection11/12/201311/12/201311/12/2013 PASS
DetailsAndy J. Long
No construction activity. Park is now managed by Boise Parks and Rec. BLD permit for grading was finaled in 2012. Will check with Brighton Corp to check if any further work is planned; BMPs still installed. No corrections at this time.
General Inspection10/28/201310/28/201310/28/2013 PASS
DetailsAndy J. Long
Construction activity for park development appears to be complete. BLD permit finaled July 2012. ESC BMPs around paths are still in place in areas that are unstabilized so will keep permit open for now.
General Inspection10/11/201310/11/201310/11/2013 PASS
DetailsEvan Jenkins
General Inspection9/26/20139/26/20139/26/2013 PASS
DetailsEvan Jenkins
General Inspection8/27/20138/27/20138/29/2013 PASS
DetailsBill VanDegrift
General Inspection8/12/20138/12/20138/12/2013 CANC
DetailsKimberly M. Johnson
General Inspection7/26/20137/26/20137/26/2013 FAIL
DetailsKimberly M. Johnson
Stream bank at end of road (where bridge is slated to go in) still not apprpriately stabilized. See onsite meeting notes from March 7th.
General Inspection7/11/20137/11/20137/11/2013 PASS
DetailsClint A Smith
General Inspection6/26/20136/26/20136/26/2013 PASS
DetailsClint A Smith
General Inspection6/11/20136/11/20136/11/2013 PASS
DetailsClint A Smith
General Inspection5/27/20135/27/20135/28/2013 CANC
DetailsKimberly M. Johnson
Holiday
General Inspection5/10/20135/10/20135/10/2013 PASS
DetailsClint A Smith
General Inspection4/25/20134/25/20134/25/2013 PASS
DetailsClint A Smith
BMP Violation4/8/20134/10/20134/10/2013APASS
DetailsClint A Smith
General Inspection4/8/20134/8/20134/8/2013 FAIL
DetailsClint A Smith
Message to RP: C/N written
Clean up the above ground washout where concrete residual is overflowing on the disturbed soil and not contained. Will follow up on 4/10/2013
General Inspection3/22/20133/22/20133/22/2013 PASS
DetailsRock A. Hudson
Conference3/5/20133/7/20133/7/2013PFAIL
DetailsKimberly M. Johnson
Met with Jay Walker and Wright Construction to discuss work to be performed under existing permit. I will check records to confirm that existing permit covers these limits/scope and will send confirmation email. Pointed out area of concern near bridge at the end of road on the northeast side of project where fill material has been pushed into the stream and evidence of a concrete wash is present. A wattle is currently around the fill parallel to flow but is half buried by material and a wattle is not an effective BMP in this circumstance. This area needs graded and stabilized with an appropriate BMP (note: tackifier will not be effective in this location). The BMP must be selected to handle standing/slow flow water.
Conference3/4/20133/7/20133/7/2013PDONE
DetailsClint A Smith
Please refer to KMJ notes
General Inspection3/4/20133/4/20133/6/2013 CANC
DetailsClint A Smith
Moved to Thursday, 3/7/2013.
General Inspection1/31/20131/31/20131/31/2013 PASS
DetailsClint A Smith
No activity at this time.
General Inspection1/16/20131/16/20131/16/2013 PART
DetailsClint A Smith
No activity
General Inspection1/1/20131/1/20131/2/2013 FAIL
DetailsClint A Smith
No activity.
BMP Violation12/14/201212/17/201212/17/2012APASS
DetailsClint A Smith
General Inspection12/14/201212/14/201212/14/2012 FAIL
DetailsClint A Smith
Message to RP;
Clean up all sediment tracked onto the roadway from landscape activities. Also remove the dirt ramp and use a non erodible type method for a ramp. Will follow up on 12/17/2012
General Inspection11/21/201211/29/201211/30/2012ACANC
DetailsClint A Smith
General Inspection11/16/201211/21/201211/21/2012APART
DetailsClint A Smith
Will complete a complete site inspection on 11/29/2012
General Inspection11/16/201211/16/201211/16/2012PCANC
DetailsClint A Smith
wrong date. Moved to 11/21/2012
Random Inspection11/16/201211/16/201211/16/2012AFAIL
DetailsClint A Smith
Verbal to RP:
Provide storm drain inlet protection on all storm drains along Barbeer Station Way. Will follow up on 11/21/2012.
General Inspection11/2/201211/2/201211/2/2012 PART
DetailsClint A Smith
Large areas are not active and have not achieved the stabilization requirement. But a large portion of the park area in active with road construction.
General Inspection10/18/201210/18/201210/18/2012 FAIL
DetailsClint A Smith
NO activity n the project. Will be meeting with Jaylen Walker next week to explain stabilization requirments per city and federal regulations once again.
General Inspection10/3/201210/3/201210/4/2012 PASS
DetailsClint A Smith
General Inspection9/18/20129/18/20129/18/2012 PART
DetailsClint A Smith
General Inspection9/3/20129/3/20129/3/2012 CANC
DetailsSteven Webb
Holiday
General Inspection8/17/20128/17/20128/17/2012 PART
DetailsClint A Smith
All areas of the park portion have installed perminate stabilization methods. But the other portions of the project are not active.
General Inspection8/2/20128/2/20128/2/2012 PART
DetailsClint A Smith
Comppleting minor landscaping irragation lines surrounding the two ponds.
General Inspection7/18/20127/18/20127/24/2012 PART
DetailsClint A Smith
Staging soil for top dressing for landscape surrounding the ponds and along the side of the Greenbelt.
General Inspection7/3/20127/3/20127/3/2012 PART
DetailsClint A Smith
Staging equipment and materail to begin road work in the project area.
General Inspection6/18/20126/18/20126/18/2012 PART
DetailsClint A Smith
Will begin to do work on the main portion off of Parkcenter Blvd of the project.
General Inspection6/1/20126/1/20126/1/2012 FAIL
DetailsClint A Smith
Areas of the project have not achieved final stabilization.
General Inspection5/17/20125/17/20125/17/2012 PART
DetailsClint A Smith
General Inspection5/2/20125/2/20125/3/2012 PART
DetailsClint A Smith
Due to high river levels, project area is taking on water through the vegitative buffer area onto the project.
General Inspection4/17/20124/17/20124/18/2012 PART
DetailsClint A Smith
NO activity on the complete project due to weather conditions.
General Inspection4/2/20124/2/20124/2/2012 PART
DetailsClint A Smith
Due to high river levels, water from the river has breached over the banks and is flowing onto and through the areas of the project where the buffer zones are estbalished with vegitation.
Conference3/16/20123/16/20123/16/2012PCANC
DetailsClint A Smith
wrong permit
General Inspection3/5/20123/5/20123/5/2012 PART
DetailsClint A Smith
Activily working on irragation on the 5 acre partal along the Paarkcenter bridge.
General Inspection2/17/20122/17/20122/17/2012 PART
DetailsClint A Smith
Actively working on Wallings corridor which is covered under the US Army Corps of Engineers. All area covered under the city permit is in compliance with permit conditions and the BMC8-17.
Conference2/1/20122/2/20122/3/2012PDONE
DetailsSteven Webb
Between 1-3pm
Conference2/1/20122/2/20122/2/2012PDONE
DetailsClint A Smith
Walked the project and went over the issues of concerns from the EPA compliance inspection of the Wallings corridor and the commercial pads.
BMP Violation1/25/20121/25/20121/26/2012ACANC
DetailsClint A Smith
Due to EPA COMPLIANCE INSPECTION
BMP Violation1/20/20121/23/20121/23/2012APART
DetailsClint A Smith
Will have the rock check dam back inplace by 1/24/2012
BMP Violation1/20/20121/22/20121/20/2012ACANC
DetailsClint A Smith
Wrong date.
General Inspection1/20/20121/20/20121/20/2012PFAIL
DetailsClint A Smith
Verbal to RP:
Re-install the rock check dam within the Wallings Corridor on the 5 acre parcel. There has been evidence of a dischage into the BOise River due to the sand sediment build up at the point of discharge from the storm event of 1.6inches with a 36 hour period. This event exceeded the 100 year storm event. WIll follow up on 1/23/2012
General Inspection1/9/20121/9/20121/9/2012 PART
DetailsClint A Smith
General Inspection12/25/201112/25/201112/27/2011 CANC
DetailsClint A Smith
Holiday
General Inspection12/9/201112/9/201112/9/2011 PART
DetailsClint A Smith
General Inspection11/24/201111/24/201111/25/2011 CANC
DetailsClint A Smith
Holiday
General Inspection11/9/201111/9/201111/9/2011 PART
DetailsClint A Smith
Still working on Walling corridor. Multiple area of the project have disturbed soil. sediment BMP's working correctly within the Wallings Corridor channel that outfalls into the Boise River.
General Inspection10/25/201110/25/201110/25/2011 PART
DetailsClint A Smith
The walling corridor along the North West end of project is active with construction along the banks. They have installed and kept multiple bmp's maintained.
Conference10/7/201110/10/201110/11/2011APASS
DetailsClint A Smith
General Inspection10/7/201110/7/201110/7/2011 PART
DetailsClint A Smith
Will be conducting a meeting with the Wetlands Group to go over the re alignment of the Wallings coridor on Monday 10th of Oct. 2011 at 10:30am.
General Inspection9/22/20119/22/20119/22/2011 PART
DetailsClint A Smith
Actively working on the Wallings Corridor.
General Inspection9/7/20119/7/20119/7/2011 PASS
DetailsClint A Smith
General Inspection8/23/20118/23/20118/23/2011 PASS
DetailsClint A Smith
General Inspection8/8/20118/8/20118/8/2011 PART
DetailsSteven Webb
Areas not being worked that needs stabilization. All wood debris has been chipped and removed from site. Green up inside the park area continues.
Random Inspection7/22/20117/22/20117/22/2011PPART
DetailsSteven Webb
Full focus to seed both via hyrdo and drill seed methods, hydro around live plantings (fetus) and lawn grass for drill seeding. Wood debris is being mulched and hauled off during inspection. Wellings has been worked but more is needed, Eagle Landscaping informed inspector 420 that they will be planting the worked Wellings Creek next week. West side of ParkCenter remains the same, inactive, water in Welling appears clear.
General Inspection7/21/20117/21/20117/21/2011 PART
DetailsClint A Smith
General Inspection7/6/20117/6/20117/6/2011PPASS
DetailsSteven Webb
Rock check dam center section has been lowered to drain water, after talking to Brent from Wetlands he will re-install rock if needed during Walling mitagation work. Park section has not been seeded but should be very soon, irragation is ready to turn on.
Conference6/29/20116/29/20116/29/2011ADONE
DetailsSteven Webb
9:00 a.m. Work on Wellings and the area between the Penn and Welling below the lower Ped. Bridge will not take place until water levels have stabilized with normal flows and ground water is not an issue which will reduce turbid discharges.
General Inspection6/24/20116/24/20116/24/2011 PASS
DetailsClint A Smith
Random Inspection6/9/20116/9/20116/9/2011ADONE
DetailsClint A Smith
River levels that begun to lower. The water level within Wallings corridor have equaled oyut to the river level. Visual clarity of the water behind the rock check dam seem to be cloudy. The overcast weather conditions make it hard to justify the clarity by sight though. Will follow up if the river level drops below 4900 CFS per the USGS web site at the Glenwood monitoring station.
General Inspection6/1/20116/1/20116/1/2011AFAIL
DetailsClint A Smith
Verbal to GC, Wetlands Group and Parks Dept.;
The section of the project on the west side of Park Center Bridge (5 acres) has been inactive of more than 4 days. Must stabilize with an approved temporary or a perminately method of stabilization.
Also keep monitoring the Wallings corridor and Boise River level. Make sure that perventive measures are ready to install prior to the Wallsing Corridor discharging into the Boise River to capture sediment if water is turbid at the time of discharge.
General Inspection5/19/20115/19/20115/19/2011 PART
DetailsClint A Smith
Water in still coming into project due to high levels of the Boise River. Walling corridor is not flowing into the Boise River. Water levels within Wallings are stil lower than the water levels of the River.
General Inspection5/4/20115/4/20115/4/2011PPASS
DetailsSteven Webb
Conditions are unchanged since last inspection. High water has overflow water in Wellings (southwest side) and along the river side of park. River side has cells and sod inplace, so standing water has high degree of water clarity. Informed Brighton and Wetlands that once water level is reduced that stabilization of base ground (Welling Channel) needs to be the highest focus of work performed.
General Inspection4/28/20114/28/20114/28/2011PPASS
DetailsSteven Webb
Controls in place, vegetative cells along the river are working fine, water slowing down by berms at cell perameters. No major problems observed.
General Inspection4/20/20114/20/20114/20/2011APART
DetailsSteven Webb
Met with Wetlands Rep (Sam) and Brighton, (J. Walker) and Boise Parks (K. Burrows) and misc others including inspector 460. Inquired about Wellings clarity, (Jay will have samples taken from west side holding area and compare with benchmark numbers). SGW asked for clarification regarding approval to dam up water in Wellings withing the floodway, Jay said that the 404 allowed this activity. Also provide a status report on the construction project (dewatering) north of the park, water will be diverted to the east of the park so very little if any construction related water should be released into Welling or other areas of the park. Exhorted parties to complete BMP (turbidity curtain) at southwest side of the new Wellings (prior to the discharge point) and that the new turbidity curtain will need to be in place prior to discharge of Wellings into the river.
General Inspection4/7/20114/8/20114/8/2011APART
DetailsSteven Webb
Water at Glenwood during inspection appr. 6,800 CFS according to the USGS website. Water have entered cell, green zone next to the river. Backflows have occurred at lower end of Welling at the discharge point. Turbid water is standing in Welling, informed Brent with Wetlands that a recommendation would be to widen the turbidity curtain at the lower end to extend the entire width of Wellings so when river flows decrease that the turbidity inside Welling will be reduced. As well, maybe consider berming this boulders, cobblers at this point. Whatever, the turbid water needs to have time to settle dirt particles prior to discharging into the Boise River.
Conference4/1/20114/4/20114/4/2011PPASS
DetailsSteven Webb
Gary and Ron, review contingency plan for high water flows during runnoff, met at the Lift Station on ParkCenter. Met with Gary, Ron and Brent from the Wetlands, also Kelly from Parks and Clint from PDS. Controls are in place, curtains, bare ground have tackifier and beams and cells in place to reduce turbid discharges in preparation of upcoming increased flows.
Conference4/1/20114/1/20114/1/2011PDONE
DetailsSteven Webb
PAM 12 RECOMMENDATION ON BARE GROUND: Unable to directly talk to G. Howard, RP but left him a voice message with recommendation that the area below the new green belt bridge which has bare ground and the new Wellings channel be treated with a PAM 12 or equal on the bare soils prior to any high flows which may result in hign CFS running through Wellings and the construction site. Treating the bare ground will result in reduction of soil particle detachment.
General Inspection3/25/20113/30/20113/30/2011PPART
DetailsSteven Webb
Verbal to RP, protection at lower end of Wellings is needed and final stabilzation is needed on bare ground at Wellings as well.
Conference3/29/20113/29/20113/30/2011PDEFR
DetailsSteven Webb
Left messager to RP, will make contact during site visit on 3/30/11
General Inspection3/22/20113/24/20113/25/2011PPART
DetailsSteven Webb
Inspected the discharge point from Welling into the river. Discharge clarity is good. Additional structual controls and stabilization of bare ground each side of the channel is needed ASAP. Informed rep from Wetlands that controls and options are needed now considering that spring runoff will be occurring very soon and that typically flows will be increasing on the Boise River which could impact the Welling channel. With as much bare ground and increase flows on Wellings the probability of soil particle detachment will increase. Will follow up new week.
General Inspection3/22/20113/22/20113/22/2011PPART
DetailsSteven Webb
Need mainyenance on BMP's on lower end of Wellings Creek new section below the G.Belt Ped. Bridge. Wattle halt covered with water at discharge, (remove), silt curtain not anchored. Important to initiate stabilization on bare ground both sides of channel. Left message for Gary H. RP.
General Inspection3/16/20113/16/20113/16/2011 PART
DetailsSteven Webb
No turbid discharge observed, wattle below erosion blanket needs to be removed and re-positioned above the blanket. Working on widening new channel below the Ped. bridge but controls in place to reduce probability of turbid discharge.
Conference3/1/20113/1/20113/1/2011PDONE
DetailsSteven Webb
Met with operators, including WLG, Brighton and Boise City. Reviewed compliance issues, mainly that turbid discharges from the project into the Boise River is not allowed. Rolled Erosion Control Blanket along Welling Creek need additional staples and wattle moved and re-installed above the top of the blanket to hold back sediment prior to the blanket.
General Inspection2/25/20112/25/20112/25/2011 PASS
DetailsClint A Smith
All dewatering within the Wallings Creek is completed for the irragation channel deversion.
General Inspection2/10/20112/10/20112/10/2011PPASS
DetailsSteven Webb
Met with Wetlands, (Gary H & Brent) & Brighton, (J. Walker) plus Boise City C. Smith. Reviewed project, summary: Welling to continue to be worked, re-graded and re-vegetated. Park area will continue to get green up completed, majority to have vegetation established this spring and summer. The majority of the area slated for vertical construction (east of Parkcenter) have been sprayed with tackifier. Other vertical construction area west of Parkcenter will be sprayed with binder relatively soon after final grading is completed. Welling is open all the way to the river, continue to have controls, including basins inserted into the drainage to allow for sediment to drop out prior to the discharge point, plus misc. sediment barriers until final completion of the Wellings work and then re-establishment of vegetation. The Penn canel will be piped soon which will totally seperated Wellings and Penn from merging. Penn will flow into the existing drainage and Wellings will flow from east to west through the park Green up along the entire area of Wellings is needed along with some additional hardsurface green belt. Reminded operators of the need to inspect and stablize as set forth in the Federal Construction General Permit.
General Inspection1/28/20111/28/20111/28/2011 PASS
DetailsClint A Smith
General Inspection1/13/20111/13/20111/13/2011 PASS
DetailsClint A Smith
General Inspection12/29/201012/29/201012/29/2010PPASS
DetailsSteven Webb
Sod buffer appr. 20' wide from the new green belt south towards the river. Rock entrance installed on the west side of the park entering onto the Parkcenter Blvd north of the bridge. Met with Inspector 460 and Kelly B. from Boise City Parks. Continued efforts to "green up" the park area of the disturbed area remains a high priority.
General Inspection12/16/201012/16/201012/16/2010 PASS
DetailsSteven Webb
Screening of topsoil and spreading continues as weather permits, new park/river greenbelt is nearing completion. No apparent problems observed.
General Inspection ESC11/30/201011/30/201011/30/2010 PASS
DetailsClint A Smith
General Inspection ESC11/12/201011/12/201011/12/2010 PASS
DetailsClint A Smith
No turbid discharge fron the north west end of project area.
General Inspection10/25/201010/27/201010/27/2010ADONE
DetailsClint A Smith
10:30-Turbidimeter sampling training
General Inspection10/25/201010/27/201010/27/2010APASS
DetailsSteven Webb
Turbidimeter -- Water sampling: Site conditions, clear, sunny and 47 degrees, time 10:35 (start of sample). Water at Ped. Bridge, MW#1 4.12 NTU, at north berm, MW#3, 3.99 NTU, at river inside containment, MW#4 4.00 NTU and background of Boise River, appr. 25 feet upgrade of Wellings Discharge, 4.80 NTU. Verfied calibration and thriple Rinse of sampling jar with D. I. water between samples. Samples indicated within range for compliance through construction site.
General Inspection10/22/201010/22/201010/22/2010PDONE
DetailsSteven Webb
Conference not general, discussion took place regarding controls and practices needed prior to the forcasted rain event. Including wattles, tackifier, turbidity curtains in new Wellings channel. Controls are expected necessary for compliance.
General Inspection ESC10/14/201010/14/201010/14/2010 PART
DetailsSteven Webb
Discussions took place with RP, (Gary H.) which included West side of ParkCenter appro. 4 acres and the importing of soils to bring the elevation up, (Appr. 2 feet). As well other misc issues, tack Barber Park Area, green up of the Park, Welling mitigation and re-vegetation, Pen Canel piping, protection of new water channel from turbidity. It was agreed that Gary H. will set up a meeting next week (week of Oct. 18th with Brighton, (Jay), Gary H., Kelly (Parks) and myself for further discussion relating to schedule and envionmental compliance. at the aark.
General Inspection9/29/20109/29/20109/29/2010APART
DetailsSteven Webb
West part of disturbed area has not been brought up to final grade but this work is scheduled to occur the first week of October. Exhorted contractor that this area will required stabilization upon completion.
General Inspection3/16/20109/21/20109/21/2010APASS
DetailsClint A Smith
Conference9/16/20109/16/20109/16/2010PDONE
DetailsSteven Webb
Met with Wetlands and Brighton for discussions regarding site stabilization: Status Report---Wellings creek is being worked including live plantings and hydroseeding directly behind after the final grade is achieved, Barber Station (building portion of the overall development) will be tackified and sediment barriers installed where an adequate green zone barrier/s do not exist, 11 acre site north of Wellings (part of Barber Station) has been seeded, tackified and mulched); The part portion of the Park is or be worked ASAP (topsoil and seed). Area north of the Boise River in high flood area continue to be greened up. With this summary being achieved all the areas will have at least temporary if not permenant stabilization initaliated. Reminded both Wetlands and Brighton that 70% of coverage is required for a site to be considered stable. Inspection is required until at which time all areas are stable and the NOT can be filed.
General Inspection ESC9/8/20109/8/20109/8/2010 PART
DetailsClint A Smith
Many area are still disturbed with the project area. Have a good vegitative buffer surrounding the project area. Have applied hydro straw with a tachifier along Warm Springs Rd. and within the 5 arces to the south west of the lift station next to the Park Center bridge.
General Inspection ESC9/7/20109/7/20109/8/2010 CANC
DetailsSteven Webb
duplicate
General Inspection ESC8/20/20108/20/20108/20/2010 PART
DetailsClint A Smith
General Inspection8/5/20108/5/20108/5/2010PPASS
DetailsSteven Webb
Wetlands informed ESC workgroup that seeding and mulching (paper) was being applied to the area north of Wellings Creek and upon this area completion they will move to the area west of Parkcenter road, close to the bridge. Inquiry of excessive soil compaction which could reduce vegetation cover was discussed. Overall, to achieve stabilization via vegetation 70% or greater of uniform coverage is expected. Total area to be applied on this application between 20 - 25 acres. Site inspection verified that a small portion of the area north of Wellings had indeed been sprayed. Cells directly north of the Boise River is greening up with about 12 inch high growth. Willows continue to sprout up.
General Inspection7/30/20107/30/20107/30/2010PPART
DetailsSteven Webb
Overall inspection did not reveal any problems but stabilization activities were expected to be observed but no activity was occurring. Called contractor and left message to provide an update.
BMP Violation7/27/20107/28/20107/28/2010APASS
DetailsClint A Smith
BMP Violation7/22/20107/27/20107/27/2010AFAIL
DetailsClint A Smith
Correction Notice:
Message to Wetlands Group:
1. Install a Stabilized construction exit over into the north west area at the lift station per industry standards.
2. Contact the city with updated RP information of a valid certified RP who will have day to day control of erosion and sediment control operations.
Failure to comply by 07/27/2010 will result in a Stop Work Order. Will re-inspect on 07/28/2010
Random Inspection7/22/20107/22/20107/22/2010PFAIL
DetailsClint A Smith
Message to GC:
Must provide a stabilized construction exit to the area on the north end of park center bridge. Also contact the city to update the RP information. Will re-inspect on 7/27/10am
General Inspection ESC7/8/20107/8/20107/8/2010 PART
DetailsSteven Webb
Discussed with RP regarding park: To summarize, Wellings re-work to commence soon, DR4 has been approved and work is being perfomed to "green up" the park area of the project, including misc swells, final grade, spreading topsoil, pressize irragation. Notice river side "check berms" are greening up nicely and live cuttings continue to green up as well between the check berms. Informed RP that stockpile material by the lift station needed temporary stabilization. As well, who and when will the approachs from the new ped. bridge be done? Overall things are progressing.
Complaint Inspection6/17/20106/17/20106/17/2010PFAIL
DetailsSteven Webb
Loose soil stockpile has not been treated, winds >13 mph will result in soil particle detachment. I have informed Boise Parks and Contractor that reasonable precautions for fugitive dust is expected.
Complaint Inspection6/16/20106/16/20106/16/2010PFAIL
DetailsClint A Smith
Verbal to RP:
Maintain dust by using the given dust control measures illistrated with the approved ESC plan.
General Inspection6/15/20106/15/20106/15/2010PPASS
DetailsSteven Webb
Discharge continues from high Boise River flows impacting the upper end of the park. Discharge appears clear.
General Inspection6/11/20106/14/20106/14/2010APART
DetailsClint A Smith
Dischage points appear clean.
General Inspection6/11/20106/11/20106/11/2010PPART
DetailsClint A Smith
Main Park (Boise River banks):
Due to the water release from the resivoirs, the Boise river has raised to a level where it has inidated the park. Wate is collectin on site and there is 3 discharge points back into the Boise River. At the time of the inspection the discharge appeared clean. Instructed both permit holders to monitor the points of discharge and utilize any BMP's to miniumize any turbid dicharge back into the waters of the U.S. Will follow-up on 6/14/2010 AM.
General Inspection6/11/20106/11/20106/11/2010PDONE
DetailsSteven Webb
Met with Kelly, (Parks), Wetlands LLC, C. Smith. Due to volume of water released from the water holdings up stream water has exceeded the 6500 cfs water mark. Water is running into the park and then discharging of water back into the river is occurring. Discharge of water duing the time of inspection has a high degree of clarity. Informed parties that daily monitioring of site is recommended and think through what types of controls could be implemented to decrease any turbid discharge if during the daily inspection turbid discharge is occurring.
General Inspection5/12/20105/12/20105/12/2010PPART
DetailsSteven Webb
Main park area: Overall site looks ok, lots of area exposed and it's up to the contractor to determine if the existing conditions meet CGP regarding final stabilization. Work continuing to be worked on the north side of Wellings Creek. Willows along the river continue to have new growth. Minimal grass observed between the willows. No signs of areas where in normal rain event conditions that turbid discharge could occur.
General Inspection5/12/20105/12/20105/12/2010PPART
DetailsSteven Webb
Ped. bridge area: Verbal to RP, Sediment barriers needed in misc. locations both north and south of new bridge box culvert. Turbidity curtain remains downstream across Wellings Creek. Work to connect new spur of the Greeen Belt with the existing Green Belt is scheduled for the week of May 24th. Access road south of the Ped. Bridge is being constructed currently.
General Inspection4/19/20104/19/20104/19/2010PDONE
DetailsSteven Webb
Ped. Bridge, discharge was clear from Wellings Creek and the main park area alon the river has green new growth on the transplanted willows. No sign of hydroseeding as of yet.
Conference4/16/20104/16/20104/16/2010PDONE
DetailsSteven Webb
Discussed upcoming site stabilization with Brighton Corp. (Jay). Summary included different options to achieve compliance regarding site stabilization. As well, I recommened finalizing perferred option and setting up a conference call with EPA Region 10 compliance assistance (Julie C. in Seattle) prior to commencing site stabilization activities. This conference call will be to outline option and endeavoring to get buy off from EPA.
General Inspection4/14/20104/15/20104/15/2010PCANC
DetailsClint A Smith
Conference4/15/20104/15/20104/15/2010PPASS
DetailsSteven Webb
Ped. Bridge: Reviewed de-watering and discussion took place on further scope of work. Met with Wetlands Group and Brighton plus Inspector 460. Discharge of water is required to be within state water quality standards for turbidity. Upon completion site stabilzation will be expected.
General Inspection4/14/20104/14/20104/14/2010PPASS
DetailsSteven Webb
PED. BRIDGE: 15 inch by pass from upstream of Wellings Creek extended to below the work area is in use, discharge water is clear. Excavated work area is being de-watered continuously into bermed area south of work area. As well, turbidity curtain is in place down stream of work area in Wellings. For compliance, water is required to be within State standards prior to discharge. At the time of inspection work area is close to needed elevation. Pre-fabrication footings will be lifter into place for support of the box culvert.
General Inspection4/13/20104/14/20104/14/2010APART
DetailsClint A Smith
Pedestrian Bridge:
Due to the concern that occured with the dewatering basin last night, the RP is responsible for altering there practices of dewatering to stay compliant. Told the RP that only non turbid water should be discharge into a well vegitative area and or back into Wallings Creek. Also capture all turbid water if it exceeds the DEQ allowable limits to allow sediment to drop within the provided dewatering basin. Once water is within the allowable limit of back ground, than a dischage would be accepted. Will re-inspect on 4/15/10 PM.
General Inspection4/13/20104/13/20104/13/2010PCANC
DetailsClint A Smith
Site Preparation4/13/20104/13/20104/13/2010PPART
DetailsClint A Smith
Pedestrian Bridge

Thay have bermed up the area where the activity is going to occur. Also turbid water has breeched the turbidity curtain. But the flow is so stagnent that it will no reach the recieving water body. Have set a marker point within that creek a the property line marker. If turbid water reaches that point after going past the curtain and also the beaver damn, then a different plan must be developed to miniumizes the turbidity within the creek. Will re-inspect in the PM today.
General Inspection4/12/20104/12/20104/12/2010AFAIL
DetailsClint A Smith

(Pedestrian Bridge Crossing)

Verbal to contractor (Brown Excavation and RP:
1. Install a stabilized construction exit.
2. Install approved storm drain inlet protection on all storm drain (4) outside of the project area on Park Center Blvd.
3. Prior to start of work a site preperation inspection must be scheduled for the approval to move ahead. Will re-inspect on 4/13/10AM
General Inspection4/6/20104/6/20104/6/2010APASS
DetailsClint A Smith
General Inspection3/22/20103/23/20103/23/2010APASS
DetailsClint A Smith
9am
General Inspection2/26/20103/2/20103/2/2010PPART
DetailsSteven Webb
Met with RP, Gary Howard and Clint Smith. Discussions regarding upcoming pedestrian bridge across Walling's Creek. Recommended silt curtain downstream of project. Also, at NW side of project additional sediment barriers are needed since the elevation of site has been raised. Discussion regarding stabilization, Ok by us to have a green zone around the perimeter of the park and then a top layer of angular rock on top of the pit run as well as for the main park road until asphalt is layed.
General Inspection2/4/20102/4/20102/4/2010PPART
DetailsSteven Webb
Verbal to RP: Sediment barrier at entrance (protection across Wallings Creek ) is in need of maintaining. Observed willow plantings along the river, looks good, plantings are on an appro. 4' spacing. West side excavation of waste materials is continuing.
Random Inspection1/22/20101/22/20101/22/2010PPASS
DetailsClint A Smith
Still excavatin out the muck at the old loggers ponds to the North west end of the project.
Site Preparation1/19/20101/20/20101/20/2010ACANC
DetailsClint A Smith
General Inspection1/12/20101/19/20101/19/2010ACANC
DetailsClint A Smith
General Inspection1/15/20101/15/20101/15/2010PPART
DetailsSteven Webb
Inspect berms along Boise River: Berms are being constructed (cells to reduce the river flows in the future). Adding top soil, plugs and vegetation is still needed.
Conference1/13/20101/13/20101/13/2010PDONE
DetailsSteven Webb
With Gary Howard & Brett Hart: Wetland Group LLC. Received addendum to plan for the water intake structure and associated activities. Reviewed processes on how to coordinate between M. William park work and Harris Ranch Phase #1. Do not want impacts to Wallings Creek which Wetlands are re-habing the creek. Harris Ranch Phase 1 can only discharge clean water at pre-development flows during their this phase 1.
General Inspection1/12/20101/12/20101/12/2010APART
DetailsClint A Smith
Still taking out the old intake structure. At the intake of the area they have utilized filtrex sock and sandbags to miniumize the flow of water enterinf the area. Also dewatering using a 4 pump that has been set 4ft down to lower the water level within the stucture area. The dischage point is to the north west of the area into the vegitative area where Wallings Creek begins. Water is clean but picking up sediment due to the fact that there is no energy disapater at the point of discharge. Told the RP to correct this issue by installing a energy disapater. Water is perking very well the the type B soil. (Pit run). Will re-inspect on 1/19/10am
Conference1/5/20101/7/20101/7/2010ADONE
DetailsSteven Webb
11:00 a.m. Reviewed overall areas of the project. I informed the group of the importance of thinking about stabilizing the areas that are not being worked. It was stated that the entire area is being worked and then It was recommended to the contractor that the SWPPP inspection reports must be able to justify that the areas are still active. Also reviewed the intake area and it was stressed to all that turbid water and other pollutants cannot be discharged into the river and that stabilization must be completed upon completion of the project.
General Inspection1/5/20101/5/20101/5/2010PPASS
DetailsSteven Webb
Composted wattle installed along Walling Creek & wetlands located on the Northwest corner of graded area.
BMP Violation1/4/20101/4/20101/4/2010APASS
DetailsClint A Smith
The North East area of concern next to the wetland at Wallings creek has been protect with a compost weighted filtrex sock.
Random Inspection12/29/200912/29/200912/29/2009PPART
DetailsSteven Webb
Verbal to RP (Brett); Sediment barrier is needed on NorthWest side of project (between bare ground and Wallings (wetlands). This could be a point of discharge resulting in the impact to wetlands. Controls in place in very near future. Will follow up next week.
Conference12/28/200912/28/200912/28/2009APASS
DetailsClint A Smith
Starting activities along the Walling creek area from the east to the west coming to thwe construction trailer. All activities covered under their 404 permit.
Conference12/23/200912/23/200912/23/2009PDONE
DetailsSteven Webb
Walk river bank with Jim W and Gary Howard. Reviewed bank cut, rock berm design. Approval for area in question (area north of upstream island) yet to be granted pending discussion with Carl G. Also reviewed intake ESC controls and that 09-00352 can be used for regulatory purposes but Brown Cons. will file their own NOI with EPA.
Conference12/21/200912/22/200912/22/2009PDONE
DetailsClint A Smith
Went over the design and the schedule that will be implimented for the erection of the lntake station at the south east end of the porject area. Waiting on the submital of the amendment to the SWPPP(erosion control plan) prior to the start date of the station.
Site Preparation12/21/200912/21/200912/21/2009PPART
DetailsClint A Smith
Discussed with GC over temporary stabilization of areas of the project that have been of will be inactive for at least 14 days or more.
General Inspection12/15/200912/15/200912/15/2009APASS
DetailsClint A Smith
General Inspection12/10/200912/10/200912/10/2009PPASS
DetailsSteven Webb
Project is frozen and snow covered. Appears ok. Walked river bank portion to reciew what excavation had occurred. Also, reviewed up coming demo of wood portion of the old pump intake building. Informed RP that work is recommended after the river flows are lowered and to block off the intake channel prior to starting. As well, attention to detail when removing the old piping equipment and pumps, they could contain residual oils which cannot be released to surface below. Think through containment prior to starting activities.
Conference12/7/200912/8/200912/9/2009PDONE
DetailsSteven Webb
Discuss Boise River Bank Cut. P. Works. Group attendees included, Boise Parks, Boise Public Works, Wetlands Group, Brighton, Land Group, Boise PDS. It was determined to hold off on the river bank cut until the bare ground buffer area north of the river was re-stabilized including live cuttings, sod, re-vegetation and misc. structure controls including rock berms and misc soft armoring and coir blankets. Contractor will submit SWPPP modification to public works (Jim W.) and PDS (Steve W).
General Inspection11/23/200911/23/200911/23/2009PPASS
DetailsSteven Webb
1:30 with Brett Hart: Met with Gary Howard. Berm at gradings edge and at appr. 6500 cfs level not to be removed until at which time a approved plan has been submitted to Boise City (public work and esc) for approval. Informed Gary that area north of the berm needs to be armored with acceptable product such as Turf Reinforced Mats (TRMs or equal) prior to any plan for the berms removal. It was made clear that this berm is to remain in place prior to approval by Boise City. This meeting also included C. Smith from Boise City. Followed up phone call to K. Burrows (Parks) briefing him what took place at this meeting.
Conference11/12/200911/12/200911/12/2009ADONE
DetailsClint A Smith
River cuts will start to become closer to theriver is certain areas where drainage cells will be installed. Explained to the developer and the contractor over stabilizing and protecting the areas where all cut will occur.

Explained to the contractor over certain requirements prior to the start of the work at the south east end of project. Must develope and submit to the city an ammendment to the erosion control plan and give a schedule of the scope of work that will be completed.
Conference10/26/200910/27/200910/27/2009PDONE
DetailsSteven Webb
Discuss structures / new and demo. 2:30 with Wetlands Group & Brighton.
General Inspection10/20/200910/20/200910/20/2009APASS
DetailsClint A Smith
INSP - Stop Work Order10/20/200910/20/200910/20/2009ACANC
DetailsClint A Smith
wrong inspection type.
Conference10/15/200910/15/200910/15/2009PCANC
DetailsSteven Webb
Training exercise
Conference10/12/200910/12/200910/12/2009ADONE
DetailsSteven Webb
Regarding Watson Creek pump house demo. Toured with B. Archibald. Ok to issue BLD (Demo) permit with blanket ESC permit if controls are in installed along the river and the RP (Brett Hart) is overseeing activities during demo and site is stabilized upon the completion of the project. Communicated this information to Jay W. (Brighton) and Gary H. (Wetlands). Will follow up.
General Inspection9/18/20099/22/20099/22/2009ACANC
DetailsClint A Smith
General Inspection9/11/20099/15/20099/15/2009PPART
DetailsSteven Webb
Marianne Williams Parks meeting @ 2:30. At the meeting discussed the need to install rock stabilized entrance on west side of project. Gate is installed but remains open. Ok to continue with sweeping until bridge is open and bridge contractor has trailer removed at which time gate to be locked and other controls in place to prevent vehicle traffic around the gate. Vehicle traffic to use stabilzed entrance on the north side of the project.
General Inspection9/15/20099/15/20099/15/2009APART
DetailsClint A Smith
Verbal to RP:
At the access point along the park center bridge, it is required to stabilize with an approved construction entrance or block off with some type of barrier.
General Inspection9/1/20099/1/20099/1/2009PPART
DetailsSteven Webb
Verbal to Gary Howard; Need rock construction entrance or block off access from project onto new ParkCenter road at the north side of the new bridge. No signs of discharges into the river. All work to date is taking place within the areas between Walling Creek and the Boise River with adequate vegetative bluffer zones to both locations from denuded soils.
Conference8/21/20098/21/20098/21/2009ADONE
DetailsEric Strole
walk thru with clint.
Site Preparation8/18/20098/18/20098/18/2009APART
DetailsClint A Smith
Still dewatering within project area. NOt reaching the Boise River. Staying within the confines of the project area.
Conference8/4/20098/4/20098/4/2009PDONE
DetailsClint A Smith
Conference8/4/20098/4/20098/4/2009PDONE
DetailsSteven Webb
2:30pm: Met with Wetlands & Boise Parks at 1:45; Discussions regarding USCOE 404 regarding wetlands as dewatering control. SGW was presented a copy of a clarification letter from G. Martinez (COE) which provided better defined perimeters regarding the dewatering into the wetlands. Walked the site and the discharges into the wetlands appears to be within the 404 conditions. No waters have appeared to have been discharged off site during the dewatering for the excavatio of the large stormwater basin at the east side of the project. At 2:30 met with prime contractors and government agencies, discussions and briefings were provided. Reps included ACHD, Brighton, Wetlands LLC, Boise City PDS (T. Records, Clint Smith & S. Webb) as well as Parks (Mike). Jay Walker (Brighton) requested a SWPPP overview at which time the letter from COE which contained the clarification regarding dewatering was summarized.
General Inspection7/30/20098/4/20098/4/2009APART
DetailsClint A Smith
Inspection occured at 8:00 am thru 10:00 am.
Majority of the project and activities are in compliance. City is still questioning the activity of dewatering within the 17 acre wetland area. Per the SWPPP's that was reviewed that the have been authorized by the Army Corps of Engineer to discharge turbid water into the wetland area.
No discharges of any water, turbid or clean within into any area of the Boise River any other bodies of water.
Random Inspection8/3/20098/3/20098/3/2009PPART
DetailsClint A Smith
The discharge point in the south west end of project. This is due to the ammendments that have been made to the channel. Such as additional sediment traps and settling basins.
General Inspection7/29/20097/30/20097/30/2009APART
DetailsClint A Smith
Still dewatering in the south west end of project area. Discharging into the Wetland area that will be re-imdigated further in the construction. Will be reading over the 404 permit conditions next week. Will re-inspect on 8/4/09 AM
General Inspection7/28/20097/29/20097/29/2009ACANC
DetailsClint A Smith
Moved to 7/30/09 at 10am. Meeting with RP.
General Inspection7/28/20097/28/20097/28/2009PPART
DetailsClint A Smith
In process on dewatering into the wetland area to the south of project area. Will be re-imidgating the wetland where discharging is occuring. Heve re-designed and implimented in a new dewatering plan and proceedure due to the water being very turbid at first going into the wetland area. Recommended to the RP to follow up with the Army Corp. to get a more decriptive document over the area of discharge due to dewatering. Was told that it was verbally given to the Corps. No document was generated with the limits or numeric limits also. No discharging is occuring into Wallings Creek and / or the Boise River. Will re-inspect on 7/29/09 AM.
Conference7/20/20097/21/20097/21/2009ADONE
DetailsClint A Smith
Discussed over the dewatering process and will be monitoring while in the process.
General Inspection7/20/20097/21/20097/21/2009APART
DetailsClint A Smith
Have ran into pocket of water where they have been excavating out unsuitibles soils. Will check with the GC and RP to see how the dewatering method will occur.
Conference7/7/20097/14/20097/14/2009ADONE
DetailsClint A Smith
Went over info of the close out of the phase of work of the utilities and rough cut of roads.
General Inspection7/7/20097/14/20097/14/2009APASS
DetailsClint A Smith
Site is in good condition. All area of ground disturbing activites are not close to the boise river at this time. Excavating out one of the ponds and have an into gound water. Will be pumping out of the pond and using the water for dust control. Will re-inspect on 7/20/09AM
Conference7/7/20097/7/20097/7/2009ADONE
DetailsSteven Webb
Discussed and reviewed site map of project. Met with Wetlands, Parks, and ESC.
Conference7/7/20097/7/20097/7/2009PDONE
DetailsClint A Smith
Went over the scope of work. All issues have ben addressed and will be maintained in the process of work. Once a phase of work is complete it will be stabilized right at the finish of that particular phase.
Site Preparation7/7/20097/7/20097/7/2009 PASS
DetailsClint A Smith
General Inspection9/11/20139/11/2013   
DetailsDave Hannah
General Inspection2/15/20132/15/2013   
DetailsClint A Smith