Site Preparation | 2/25/2010 | 2/25/2010 | 2/25/2010 | P | PASS |
Jim Sly
|
|
|
Derick phone
|
DOC - Permit Finaled | 2/25/2010 | 2/25/2010 | 2/25/2010 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 2/9/2010 | 2/9/2010 | 2/9/2010 | P | FAIL |
Mike Jordan
|
|
|
Derick phone. Final stabalization not completed.
|
General Inspection | 11/30/2009 | 11/30/2009 | 11/30/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 10/16/2009 | 10/16/2009 | 10/16/2009 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 10/15/2009 | 10/15/2009 | 10/15/2009 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 9/23/2009 | 9/23/2009 | 9/23/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 9/16/2009 | 9/16/2009 | 9/16/2009 | P | PART |
Jim Sly
|
|
|
Derick Phone Reminded Derick (RP)......that Mortar mixer and pour area required to be Contained to control any spills. Masonry Contr. is not on site yet.
|
Site Preparation | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PASS |
Jim Sly
|
|
|
Derick phone
|
Site Preparation | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Jim Sly
|
|
|
Removed stockpile from driveway....swept hard surfaces. Allowed for Concr washout area with plastic liner.
|
Site Preparation | 8/14/2009 | 8/14/2009 | 8/14/2009 | | PART |
Clint A Smith
|
|
|
Spoke with concrete company and they told me that washout will occur at batch plant and they will re-locate stockpile along the north end of drive way.
|