Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberESC09-00379
StatusFinaled
Name GREGG BARNEY
Site Address 270 E PENNSYLVANIA AVE
Project NameParkCenter Assembly of God
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/3/20106/3/20106/3/2010 DONE
DetailsClint A Smith
DOC - Permit Finaled6/3/20106/3/20106/3/2010PPASS
DetailsClint A Smith
Site Final11/13/200912/10/200912/10/2009ACANC
DetailsClint A Smith
duplicate
Site Final11/13/200912/10/200912/10/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Must stabilize the field to the west where the spoils were spead out once a thaw occurs in the spring of 201o to achieve final stabilization of the disturbed area.
Random Inspection11/16/200911/16/200911/16/2009PNR
DetailsBob Reichert
see comments by 316
Site Final11/13/200911/13/200911/13/2009PFAIL
DetailsJim Sly
Gregg phone
Need to sweep all hard surfaces and parking lot prior to removing (2) drain filters. Clean up area around storage shed. spread gravel and level out so water will not drain to parking lot. Finish landscaping at N.E. corner of bldg.
Random Inspection11/9/200911/9/200911/9/2009PPASS
DetailsBill VanDegrift
General Inspection9/24/20099/24/20099/24/2009PPASS
DetailsBob Reichert
looked ok
General Inspection9/23/20099/23/20099/23/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection8/10/20098/10/20098/10/2009PPASS
DetailsJim Storey
Random Inspection7/22/20097/22/20097/22/2009PPART
DetailsJim Storey
Random Inspection7/21/20097/21/20097/21/2009APART
DetailsJim Storey
Site Preparation7/15/20097/15/20097/15/2009 CANC
DetailsClint A Smith
Completed on 07/14/09
Site Preparation7/10/20097/14/20097/14/2009APART
DetailsClint A Smith
Discussec with the project over the provisions required such as a washout and storm drain inlet protection. Also told the project that once all soil has been excavated and spread out on the field to the west that is needs to be temporarly stabilized with a tachifier or permanitely stabilize with a seed mix and watered freaquently to promote germination of the seed.
Site Preparation7/10/20097/10/20097/10/2009ACANC
DetailsClint A Smith
Will occur on 7/14/09 at 10am.