Site Final | 8/17/2009 | 8/17/2009 | 8/17/2009 | P | PASS |
Jim Sly
|
|
|
Syeve phone ###-####
|
Site Final | 8/17/2009 | 8/17/2009 | 8/17/2009 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 7/13/2009 | 7/13/2009 | 7/13/2009 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 7/1/2009 | 7/6/2009 | 7/6/2009 | A | PASS |
Clint A Smith
|
|
|
Clean up
|
Site Preparation | 7/1/2009 | 7/1/2009 | 7/1/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all concrete and any other product residuals out of gutterpan and street area. Will re-inspect on 7/6/09
|
Site Preparation | 6/30/2009 | 6/30/2009 | 6/30/2009 | A | PART |
Tony Young
|
|
|
verbal corrections on clean out area
|