Site Final | 9/8/2009 | 9/8/2009 | 9/8/2009 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/8/2009 | 9/8/2009 | 9/8/2009 | P | PASS |
Mike Jordan
|
|
|
Final stabalization was completed.
|
Random Inspection | 8/12/2009 | 8/12/2009 | 8/12/2009 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 8/11/2009 | 8/11/2009 | 8/11/2009 | P | PASS |
Mike Jordan
|
|
|
All construction debries have been collected and a bin has been provided.
|
BMP Violation | 8/10/2009 | 8/10/2009 | 8/10/2009 | P | FAIL |
Mike Jordan
|
|
|
No progress on esc issues were made at tme of inspection.
|
General Inspection | 8/10/2009 | 8/10/2009 | 8/10/2009 | A | FAIL |
Mike Jordan
|
|
|
Needs to pisk up all const. debries. A bin must be provided.
|
General Inspection | 7/28/2009 | 7/29/2009 | 7/29/2009 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/28/2009 | 7/28/2009 | 7/29/2009 | A | CANC |
Clint A Smith
|
|
|
will inspect on 7/29/09.
|
General Inspection | 7/28/2009 | 7/28/2009 | 7/28/2009 | P | PART |
Bob Reichert
|
|
|
called 315 and 360, assigned inspection to 360
|
Site Preparation | 7/16/2009 | 7/16/2009 | 7/16/2009 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 7/10/2009 | 7/10/2009 | 7/10/2009 | A | PART |
Jim Storey
|
|
|
|
Site Preparation | 7/9/2009 | 7/10/2009 | 7/10/2009 | A | PASS |
Jim Sly
|
|
|
Shelly phone ###-####
|