Aging Inspection | 12/15/2010 | 12/15/2010 | 12/15/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 12/15/2010 | 12/15/2010 | 12/15/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 10/30/2009 | 10/30/2009 | 10/30/2009 | P | NR |
Jim Sly
|
|
|
Ray
|
General Inspection | 10/21/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 10/7/2009 | 10/8/2009 | 10/8/2009 | A | PASS |
Jim Sly
|
|
|
Ray Phone #: ###-####
|
Random Inspection | 10/5/2009 | 10/5/2009 | 10/5/2009 | P | FAIL |
Jim Sly
|
|
|
Ray phone ###-#### Talked to Ray .....need to clean lot, sweep hard surfaces, replace waddle at front of lot, will check at Energy code insp.
|
General Inspection | 10/2/2009 | 10/2/2009 | 10/2/2009 | A | PASS |
Jack Frank
|
|
|
|
BMP Violation | 9/24/2009 | 9/28/2009 | 9/28/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/24/2009 | 9/24/2009 | 9/24/2009 | | FAIL |
Clint A Smith
|
|
|
Message to RP: 1. Remove stockpile of of the sidewalk. 2. Install sediment barriers along the front of lot per approved standards by the city of boise. 3. Clean up all hardsurfaces of all sediment and debris. Will re-inspect on 9/28/09am
|
Site Preparation | 9/23/2009 | 9/23/2009 | 9/23/2009 | A | PASS |
Jim Sly
|
|
|
|
Site Preparation | 9/22/2009 | 9/22/2009 | 9/22/2009 | P | PART |
Jim Sly
|
|
|
Talked to RP..........Need to sweep all hard surfaces after excavation. Will check at foundation inspection.
|
Site Final | 9/22/2009 | 9/22/2009 | 9/22/2009 | P | CANC |
Jim Sly
|
|
|
NR
|
Site Preparation | 7/20/2009 | 7/20/2009 | 7/20/2009 | | PART |
Eric Strole
|
|
|
will post esc sign when plans are picked up & pryer to any work. rp will clean sidewalks & gutter pans by days end.
|