Permit Information
Permit NumberESC09-00407
StatusFinaled
Name ZUHDIJA VILA
Site Address 7022 W POPLAR ST
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/29/200910/29/200910/29/2009PPASS
DetailsTom Arcoraci
General Inspection10/21/200910/21/200910/21/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection9/17/20099/17/20099/17/2009PPASS
DetailsTom Arcoraci
BMP Violation9/16/20099/16/20099/17/2009PPASS
DetailsClint A Smith
BMP Violation9/15/20099/16/20099/16/2009AFAIL
DetailsJack Frank
corrections not made called Clint he will follow up
BMP Violation9/10/20099/14/20099/15/2009ACANC
DetailsJack Frank
Follow up from 9/10/09, refer to posted written correction notice and history in computer.
General Inspection9/10/20099/10/20099/10/2009PFAIL
DetailsJack Frank
called left message correction posted shall clean site and hard surfaces of dirt gravel, concrete washout material and residue, also shall provide a approved concrete washout pit for remaining construction work, ie paint sheetrock mud , mortar
INSP - Stop Work Order8/8/20098/10/20098/10/2009APASS
DetailsClint A Smith
BMP Violation8/4/20098/6/20098/6/2009AFAIL
DetailsClint A Smith
Stop Work Order Posted. See inspection record.
INSP - Stop Work Order8/6/20098/6/20098/6/2009PFAIL
DetailsClint A Smith
Verbal to RP:
STOP WORK ORDER.
1. Protect Storm Drain to the west of lot.
2. Install sediment barriers along the stock piles.
Must call for a re-inspection to have Stop Work Order lifted once all issues are corrected.
Site Preparation8/4/20098/4/20098/4/2009PPART
DetailsJim Sly
Sign posted.....Sidewalk and gutter clean....Working on Concr washout.....RP to add protection at drain inlet......advised about protection at front and back of lot.
Site Preparation8/4/20098/4/20098/4/2009 FAIL
DetailsClint A Smith
Verbal to RP:
1. Install sediment protection along the front and back perimeter of lot.
2. Install proper storm drain inlet protection.
3. Post ESC sign at front of lot.
4. Provide a concrete washout prior to the pour of the footings.
Will re-inspect on 7/6/09AM.