Site Final | 10/29/2009 | 10/29/2009 | 10/29/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 10/21/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BMP Violation | 9/16/2009 | 9/16/2009 | 9/17/2009 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/15/2009 | 9/16/2009 | 9/16/2009 | A | FAIL |
Jack Frank
|
|
|
corrections not made called Clint he will follow up
|
BMP Violation | 9/10/2009 | 9/14/2009 | 9/15/2009 | A | CANC |
Jack Frank
|
|
|
Follow up from 9/10/09, refer to posted written correction notice and history in computer.
|
General Inspection | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | FAIL |
Jack Frank
|
|
|
called left message correction posted shall clean site and hard surfaces of dirt gravel, concrete washout material and residue, also shall provide a approved concrete washout pit for remaining construction work, ie paint sheetrock mud , mortar
|
INSP - Stop Work Order | 8/8/2009 | 8/10/2009 | 8/10/2009 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 8/4/2009 | 8/6/2009 | 8/6/2009 | A | FAIL |
Clint A Smith
|
|
|
Stop Work Order Posted. See inspection record.
|
INSP - Stop Work Order | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: STOP WORK ORDER. 1. Protect Storm Drain to the west of lot. 2. Install sediment barriers along the stock piles. Must call for a re-inspection to have Stop Work Order lifted once all issues are corrected.
|
Site Preparation | 8/4/2009 | 8/4/2009 | 8/4/2009 | P | PART |
Jim Sly
|
|
|
Sign posted.....Sidewalk and gutter clean....Working on Concr washout.....RP to add protection at drain inlet......advised about protection at front and back of lot.
|
Site Preparation | 8/4/2009 | 8/4/2009 | 8/4/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: 1. Install sediment protection along the front and back perimeter of lot. 2. Install proper storm drain inlet protection. 3. Post ESC sign at front of lot. 4. Provide a concrete washout prior to the pour of the footings. Will re-inspect on 7/6/09AM.
|