Aging Inspection | 4/5/2011 | 4/5/2011 | 4/5/2011 | | DONE |
Jim Johnson
|
|
|
|
DOC - Permit Finaled | 4/5/2011 | 4/5/2011 | 4/5/2011 | P | PASS |
Jim Johnson
|
|
|
|
Site Final | 1/7/2010 | 1/7/2010 | 1/7/2010 | P | NR |
Jim Sly
|
|
|
Need to complete landscaping.
|
Random Inspection | 12/14/2009 | 12/14/2009 | 12/14/2009 | P | PASS |
Jim Sly
|
|
|
Ray phone
|
Random Inspection | 12/10/2009 | 12/11/2009 | 12/11/2009 | A | PASS |
Jim Sly
|
|
|
Ray phone
|
General Inspection | 12/10/2009 | 12/10/2009 | 12/10/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok, lot of snow
|
BMP Violation | 12/4/2009 | 12/7/2009 | 12/7/2009 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 12/1/2009 | 12/4/2009 | 12/4/2009 | P | PART |
Clint A Smith
|
|
|
Verbal RP: Re-install sediment barrier per manufatures specs. Will re-inspect on 12/7/09PM.
|
Site Preparation | 12/2/2009 | 12/2/2009 | 12/2/2009 | A | PASS |
Jim Sly
|
|
|
Concr washout pit done and located on another lot.
|
Site Preparation ESC | 12/1/2009 | 12/1/2009 | 12/1/2009 | | FAIL |
Clint A Smith
|
|
|
Message to RP: Install a sediment barrier along the perimeter of lot along the sidewalk. Will re-inspect on 12/4/09PM
|
Site Preparation | 11/30/2009 | 11/30/2009 | 11/30/2009 | P | PART |
Jim Sly
|
|
|
Called RP.....Need a new designated washout pit and sign.
|