Site Final | 3/2/2011 | 3/2/2011 | 3/2/2011 | A | PASS |
Jack Frank
|
|
|
|
Aging Inspection | 2/28/2011 | 2/28/2011 | 3/2/2011 | | CANC |
Jack Frank
|
|
|
|
Site Final | 12/18/2009 | 12/18/2009 | 12/21/2009 | P | NR |
Jim Sly
|
|
|
Need to complete landscaping.
|
Random Inspection | 10/28/2009 | 10/29/2009 | 10/29/2009 | A | PASS |
Jim Sly
|
|
|
Dan
|
Random Inspection | 10/23/2009 | 10/29/2009 | 10/28/2009 | A | CANC |
Jim Sly
|
|
|
Dan phone
|
Random Inspection | 10/23/2009 | 10/23/2009 | 10/23/2009 | P | FAIL |
Jim Sly
|
|
|
Talked to Dan....Landscaping area involved with C/N....re-insp 10/29
|
Site Preparation | 10/21/2009 | 10/21/2009 | 10/21/2009 | A | FAIL |
Jim Sly
|
|
|
Verb....RP sweep, waddle, trash.
|
General Inspection | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | PASS |
Eric Strole
|
|
|
per steve webb, need to install a concrete washout pryer to next pour.
|
Site Final | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | CANC |
Eric Strole
|
|
|
|
BMP Violation | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | FAIL |
Eric Strole
|
|
|
left verbal & written correction with rp that a stop work has been issued till all corrections are complete. install a concrete washout pit. put concrete spoil piles in washout pit. install wattles in front where over 2 percent grade & clean up tracking.
|
INSP - Stop Work Order | 8/28/2009 | 8/28/2009 | 8/28/2009 | P | FAIL |
Eric Strole
|
|
|
left verbal & written correction with rp that a stop work has been issued till all corrections are complete. install a concrete washout pit. put concrete spoil piles in washout pit. install wattles in front where over 2 percent grade & clean up tracking.
|
BMP Violation | 8/24/2009 | 8/27/2009 | 8/27/2009 | A | FAIL |
Eric Strole
|
|
|
left verbal & written correction with rp to install sediment barriers in front where over 2 percent grade & provide concrete washout pit. concrete trucks are washing out on ground. if not complete within 24 hrs a stop work may be issued.
|
Site Preparation | 8/24/2009 | 8/24/2009 | 8/24/2009 | | FAIL |
Clint A Smith
|
|
|
Message to RP: Install a sediment barrier along the front of lots, due to the fact of slope to the access pave area is over a 2% grade slope. Will be re-inspected on 8/27/09 AM.
|
Site Preparation | 8/19/2009 | 8/20/2009 | 8/20/2009 | A | PASS |
Jim Sly
|
|
|
Dan ###-####
|
Site Preparation | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PASS |
Jim Sly
|
|
|
Dan Clark
|