Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC09-00461
StatusFinaled
Name CHAD CANNON
Site Address 831 E RUBICON DR
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection2/22/20112/22/20112/22/2011 DONE
DetailsClint A Smith
permit finalled.
DOC - Permit Finaled2/22/20112/22/20112/22/2011PPASS
DetailsClint A Smith
Random Inspection3/19/20103/22/20103/22/2010PPART
DetailsJim Storey
460 waiting for rp to reply.
BMP Violation1/14/20101/19/20101/20/2010AFAIL
DetailsClint A Smith
Message to rP: When is clean up going to be completed. Waiting on a reply.
Site Final1/14/20101/18/20101/15/2010ACANC
DetailsTroy James
clint will complete inspection
Site Final1/13/20101/13/20101/14/2010APART
DetailsTroy James
talked to rp to clean concrete spoils and garabage from adjacent lot for final inspection, he thought he could do it the following monday
BMP Violation1/14/20101/14/20101/14/2010AFAIL
DetailsClint A Smith
Message with RP:
Want to discuss the lot to the north over cleanup. Will follow up on 11/19/10.
Site Final12/10/200912/10/200912/10/2009PNR
DetailsJim Storey
wip will call in when complted.
General Inspection12/3/200912/3/200912/3/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection9/14/20099/14/20099/14/2009PPASS
DetailsJim Storey
Random Inspection9/11/20099/11/20099/11/2009PPASS
DetailsJim Storey
General Inspection9/10/20099/10/20099/10/2009PPASS
DetailsBob Reichert
looked ok
General Inspection9/10/20099/10/20099/10/2009PPASS
DetailsTroy James
site ok
Random Inspection9/1/20099/1/20099/1/2009APART
DetailsBob Reichert
looked ok
BMP Violation8/13/20098/13/20098/14/2009APASS
DetailsEric Strole
BMP Violation8/10/20098/11/20098/11/2009PFAIL
DetailsEric Strole
left written and verbal correction with rp to clean dirt & debris off all hard surfaces & install wattles per manafacture installation standards by 8-13-09 am.
BMP Violation8/7/20098/10/20098/10/2009PFAIL
DetailsEric Strole
no corrections from correction notice have been completed. left verbal correction via voice mail of rp that if corrections are not complete by 08-11-09 am a stop work will be issued. will reinspect 08-11-09 pm.
Complaint Inspection8/8/20098/10/20098/10/2009AFAIL
DetailsEric Strole
Robert ###-####
TRACKING-called robert, no answer or voice mail. If tracking not cleaned up by 08-11-09 am a stop work will be issued.
Site Preparation ESC8/7/20098/7/20098/7/2009 FAIL
DetailsClint A Smith
Message to RP:
CORRECTION NOTICE;
1. Remove all sediment and debris off of all hardsurfaces. Including the seperated sidewalk.
2. Install sediment barrier per industry standards.
*Failure to comply will result in a Stop Work Order. Will re-inspect on 8/10/09 PM.
Site Preparation8/5/20098/5/20098/5/2009PPART
DetailsJim Storey
rp in route to finsh work.
General Inspection8/3/20098/3/20098/3/2009PPASS
DetailsBob Reichert
met rp, he is contacting general and going to clean by street and add controls as needed