Aging Inspection | 2/22/2011 | 2/22/2011 | 2/22/2011 | | DONE |
Clint A Smith
|
|
|
permit finalled.
|
DOC - Permit Finaled | 2/22/2011 | 2/22/2011 | 2/22/2011 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 3/19/2010 | 3/22/2010 | 3/22/2010 | P | PART |
Jim Storey
|
|
|
460 waiting for rp to reply.
|
BMP Violation | 1/14/2010 | 1/19/2010 | 1/20/2010 | A | FAIL |
Clint A Smith
|
|
|
Message to rP: When is clean up going to be completed. Waiting on a reply.
|
Site Final | 1/14/2010 | 1/18/2010 | 1/15/2010 | A | CANC |
Troy James
|
|
|
clint will complete inspection
|
Site Final | 1/13/2010 | 1/13/2010 | 1/14/2010 | A | PART |
Troy James
|
|
|
talked to rp to clean concrete spoils and garabage from adjacent lot for final inspection, he thought he could do it the following monday
|
BMP Violation | 1/14/2010 | 1/14/2010 | 1/14/2010 | A | FAIL |
Clint A Smith
|
|
|
Message with RP: Want to discuss the lot to the north over cleanup. Will follow up on 11/19/10.
|
Site Final | 12/10/2009 | 12/10/2009 | 12/10/2009 | P | NR |
Jim Storey
|
|
|
wip will call in when complted.
|
General Inspection | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 9/14/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | PASS |
Troy James
|
|
|
site ok
|
Random Inspection | 9/1/2009 | 9/1/2009 | 9/1/2009 | A | PART |
Bob Reichert
|
|
|
looked ok
|
BMP Violation | 8/13/2009 | 8/13/2009 | 8/14/2009 | A | PASS |
Eric Strole
|
|
|
|
BMP Violation | 8/10/2009 | 8/11/2009 | 8/11/2009 | P | FAIL |
Eric Strole
|
|
|
left written and verbal correction with rp to clean dirt & debris off all hard surfaces & install wattles per manafacture installation standards by 8-13-09 am.
|
BMP Violation | 8/7/2009 | 8/10/2009 | 8/10/2009 | P | FAIL |
Eric Strole
|
|
|
no corrections from correction notice have been completed. left verbal correction via voice mail of rp that if corrections are not complete by 08-11-09 am a stop work will be issued. will reinspect 08-11-09 pm.
|
Complaint Inspection | 8/8/2009 | 8/10/2009 | 8/10/2009 | A | FAIL |
Eric Strole
|
|
|
Robert ###-#### TRACKING-called robert, no answer or voice mail. If tracking not cleaned up by 08-11-09 am a stop work will be issued.
|
Site Preparation ESC | 8/7/2009 | 8/7/2009 | 8/7/2009 | | FAIL |
Clint A Smith
|
|
|
Message to RP: CORRECTION NOTICE; 1. Remove all sediment and debris off of all hardsurfaces. Including the seperated sidewalk. 2. Install sediment barrier per industry standards. *Failure to comply will result in a Stop Work Order. Will re-inspect on 8/10/09 PM.
|
Site Preparation | 8/5/2009 | 8/5/2009 | 8/5/2009 | P | PART |
Jim Storey
|
|
|
rp in route to finsh work.
|
General Inspection | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | PASS |
Bob Reichert
|
|
|
met rp, he is contacting general and going to clean by street and add controls as needed
|