Site Final | 5/7/2010 | 5/14/2010 | 5/14/2010 | A | PASS |
Dave Hannah
|
|
|
|
Site Final | 5/7/2010 | 5/7/2010 | 5/7/2010 | P | FAIL |
Dave Hannah
|
|
|
needs to finish land scaping and clesn up site
|
BMP Violation | 1/14/2010 | 1/19/2010 | 1/19/2010 | A | PASS |
Troy James
|
|
|
corrections have been made
|
BMP Violation | 1/14/2010 | 1/14/2010 | 1/14/2010 | P | FAIL |
Troy James
|
|
|
talked to rp to remove all sediment and debris from sidewalk and street curb and to do a little maintanence to erosion protection system
|
Random Inspection | 9/18/2009 | 9/18/2009 | 9/18/2009 | P | PASS |
Dave Hannah
|
|
|
all looks good
|
Site Preparation | 8/28/2009 | 9/1/2009 | 9/1/2009 | A | PASS |
Troy James
|
|
|
site prep has now been completed, bmps in place and washout in place
|
Random Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 | A | PASS |
Mike Jordan
|
|
|
ESC permit sign was posted. BMP's in place. Site was clean.
|
Site Preparation | 8/26/2009 | 8/28/2009 | 8/28/2009 | A | PASS |
Troy James
|
|
|
sign posted, washout pit north west corner of lot, cleaned gutter drain, need to add more wadle west side of lot, will reinspect 9/1/009
|
Site Preparation | 8/26/2009 | 8/26/2009 | 8/26/2009 | | CANC |
Dave Hannah
|
|
|
|
Site Preparation | 8/26/2009 | 8/26/2009 | 8/26/2009 | | PART |
Troy James
|
|
|
talked with rp on site, will reinspect friday
|