Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC09-00501
StatusFinaled
Name JEREMY HOPKINS
Site Address 519 N ALLUMBAUGH ST
Project NameDarigold
Customer Number 
ePlanReview 
Description
Tank Addition //Per Steve Webb ok for Conger Mgmt. to pick up permit prior to Bld09-01336 being ready so they can start sitework. When building permit is issued change to General Contractor's RP and charge transfer fee of $52.50//8/31/09 LEG
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/30/20106/30/20106/30/2010APASS
DetailsJim Storey
General Inspection ESC5/26/20105/26/20105/26/2010 CANC
DetailsSteven Webb
Random Inspection3/25/20103/25/20103/25/2010APASS
DetailsJim Storey
General Inspection1/19/20101/19/20101/19/2010PPASS
DetailsBob Reichert
looked ok
General Inspection1/8/20101/8/20101/8/2010PCANC
DetailsBob Reichert
phone conference, did not get to site
General Inspection12/23/200912/30/200912/30/2009APASS
DetailsClint A Smith
RP update and permit transfer
BMP Violation12/22/200912/23/200912/23/2009AFAIL
DetailsClint A Smith
Verbal to GC (Durrel):
Prior to 12/30/09 the GC must provide a valid RP with day to day control and also a transfer of permit into the GC name and out of CMG. Will re-inspect on 12/30/09 AM.
General Inspection12/23/200912/23/200912/23/2009PPART
DetailsBob Reichert
looked ok, 460 will find out about rp
Tracking Control12/18/200912/22/200912/22/2009APART
DetailsClint A Smith
Access has been addressed. I have explained to the GC of the project that a new RP is needed by 22/23/09AM due to the fact the the current RP is not in the loop anymore on the project. Will re-inspect on 12/23/09AM.
General Inspection12/18/200912/18/200912/18/2009PFAIL
DetailsBob Reichert
see 460 comments
Tracking Control12/18/200912/18/200912/18/2009AFAIL
DetailsClint A Smith
Verbal message to RP:
Need to install a stabilized construction exit at the point of access to the project area. Will re-inspect on 12/22/09am
General Inspection11/19/200911/19/200911/19/2009PPART
DetailsBob Reichert
looked ok, 460 was there and commented about sand pile for runoff area
Random Inspection10/5/200910/5/200910/5/2009PPASS
DetailsJim Storey
Random Inspection9/30/20099/30/20099/30/2009PPASS
DetailsJim Storey
Random Inspection9/29/20099/29/20099/29/2009APASS
DetailsJim Storey
Random Inspection9/25/20099/25/20099/25/2009PPASS
DetailsJim Storey
Site Preparation9/18/20099/18/20099/18/2009 PASS
DetailsClint A Smith
Random Inspection9/16/20099/16/20099/16/2009PPASS
DetailsJim Storey
Random Inspection9/16/20099/16/20099/16/2009APASS
DetailsClint A Smith
Random Inspection9/15/20099/15/20099/15/2009PPASS
DetailsJim Storey
Site Preparation9/3/20099/3/20099/3/2009APART
DetailsSteven Webb
Verbal to RP; Post yellow sign and be aware of trackout and install construction entrance if needed.
Site Preparation9/7/20099/7/2009   
DetailsClint A Smith