Site Final | 12/14/2009 | 12/15/2009 | 12/15/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 10/9/2009 | 10/9/2009 | 10/9/2009 | P | PASS |
Bob Reichert
|
|
|
|
General Inspection | 10/8/2009 | 10/8/2009 | 10/8/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok, see 435 comments
|
Random Inspection | 10/7/2009 | 10/7/2009 | 10/7/2009 | P | PASS |
Troy James
|
|
|
SITE OK NEED GARBAGE REMOVED FROM ADJACENT LOTS FOR FINAL
|
Random Inspection | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 9/4/2009 | 9/4/2009 | 9/4/2009 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 9/3/2009 | 9/3/2009 | 9/4/2009 | P | PART |
Bob Reichert
|
|
|
lots of daily activity, 450 checking on
|
BMP Violation | 9/1/2009 | 9/1/2009 | 9/1/2009 | A | PART |
Mike Jordan
|
|
|
Work in progress. Still needs to replace di protection. Rp oted that would be completed by end of work today.
|
General Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 | P | PART |
Jim Sly
|
|
|
Todd phone 608 9124 Notified RP...Need to Clean up debris, remove, clean and replace DI filters, and sweep all hard surfaces.
|
Site Preparation ESC | 8/25/2009 | 8/25/2009 | 8/25/2009 | | PART |
Steven Webb
|
|
|
Verbal to RP: Need waste container, sweep daily or as needed.
|
Site Preparation | 8/19/2009 | 8/19/2009 | 8/19/2009 | P | CANC |
Jim Sly
|
|
|
NR
|