Site Final | 3/26/2010 | 3/29/2010 | 3/29/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 3/29/2010 | 3/29/2010 | 3/29/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Site Final | 3/26/2010 | 3/26/2010 | 3/26/2010 | A | PART |
Tom Arcoraci
|
|
|
|
Random Inspection | 3/11/2010 | 3/11/2010 | 3/11/2010 | A | PART |
Bill VanDegrift
|
|
|
left message to sweep gutters and walks minor trackout
|
Random Inspection | 2/4/2010 | 2/4/2010 | 2/4/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 2/4/2010 | 2/4/2010 | 2/4/2010 | A | CANC |
Tom Arcoraci
|
|
|
|
Random Inspection | 2/2/2010 | 2/2/2010 | 2/2/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
Tracking Control | 1/11/2010 | 1/13/2010 | 1/13/2010 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 1/11/2010 | 1/11/2010 | 1/11/2010 | A | CANC |
Clint A Smith
|
|
|
|
Tracking Control | 1/8/2010 | 1/11/2010 | 1/11/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Change the contact number with the city so can be contacted if any issues occur.
Clean up all tracing onto Whisper woood to the south. Will re-inspect on 11/13/10.
|
Tracking Control | 1/8/2010 | 1/8/2010 | 1/8/2010 | A | FAIL |
Clint A Smith
|
|
|
Message to RP: CLean up tracking off of the south end of project area. Will re-inspect on 1/11/09
|
BMP Violation | 11/30/2009 | 12/2/2009 | 12/2/2009 | P | PART |
Clint A Smith
|
|
|
Actively correcting all issues. Since stock pile will be removed and there will not be a grade of 2% or greater, a sediment barrier is not required.
|
BMP Violation | 11/27/2009 | 11/30/2009 | 11/30/2009 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: (message to RP) 1. Install a sediment barrier along the front of lot and/or remove or relocate stockpile at front of lot. 2. Clean up all trackng off of lot onto hard surface. 3. Install a stabilized construction exit at the concrete washout pit or relocate concrete washout pit where able to access to miniumize any tracking. Failure to comply will result into further enforcement. Will re-inspect on 12/2/09PM.
|
Random Inspection | 11/30/2009 | 11/30/2009 | 11/30/2009 | A | NR |
Tom Arcoraci
|
|
|
|
Site Preparation | 11/27/2009 | 11/27/2009 | 11/27/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal message to RP: Install a sediemnt barrier along the front of lot where stock piles are located. Also clean up tracking where access to lot has been done. If going to use as an access a stabilized construction exit will be required. Will re-inspect on 11/30/09AM.
|
Site Preparation | 11/25/2009 | 11/25/2009 | 11/25/2009 | P | PART |
Mike Jordan
|
|
|
Needs to post ESC sign. Conc. washout in place. Verbal c/n to RP.
|
Random Inspection | 11/24/2009 | 11/24/2009 | 11/24/2009 | P | PEND |
Tom Arcoraci
|
|
|
|