Permit Information
Permit NumberESC09-00510
StatusFinaled
Name SCOTT ASIN
Site Address 408 S WHISPERWOOD WAY
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/27/20104/28/20104/28/2010APASS
DetailsTom Arcoraci
Site Final4/26/20104/27/20104/27/2010PPART
DetailsTom Arcoraci
Random Inspection4/15/20104/15/20104/15/2010PPASS
DetailsTom Arcoraci
General Inspection4/5/20104/5/20104/5/2010PPASS
DetailsBob Reichert
Tracking Control2/11/20102/12/20102/12/2010PPASS
DetailsClint A Smith
Random Inspection2/11/20102/11/20102/11/2010APART
DetailsTom Arcoraci
sweep up track out
Random Inspection2/9/20102/9/20102/9/2010APASS
DetailsTom Arcoraci
Tracking Control1/11/20101/13/20101/13/2010APASS
DetailsClint A Smith
Tracking Control1/8/20101/11/20101/11/2010AFAIL
DetailsClint A Smith
Verbal to RP:
Change the contact number with the city so can be contacted if any issues occur.

Clean up all tracing onto Whisper woood to the south. Will re-inspect on 11/13/10.
Tracking Control1/8/20101/8/20101/8/2010AFAIL
DetailsClint A Smith
Message to RP:
CLean up tracking off of the south end of project area. Will re-inspect on 1/11/09
BMP Violation11/30/200912/2/200912/2/2009PPART
DetailsClint A Smith
Actively correcting all issues. Since stock pile will be removed and there will not be a grade of 2% or greater, a sediment barrier is not required.
General Inspection12/1/200912/1/200912/1/2009PPART
DetailsBob Reichert
see 460 comments
BMP Violation11/27/200911/30/200911/30/2009AFAIL
DetailsClint A Smith
Correction Notice: (message to RP)
1. Install a sediment barrier along the front of lot and/or remove or relocate stockpile at front of lot.
2. Clean up all trackng off of lot onto hard surface.
3. Install a stabilized construction exit at the concrete washout pit or relocate concrete washout pit where able to access to miniumize any tracking.
Failure to comply will result into further enforcement.
Will re-inspect on 12/2/09PM.
Site Preparation11/27/200911/27/200911/27/2009 FAIL
DetailsClint A Smith
Verbal message to RP:
Install a sediemnt barrier along the front of lot where stock piles are located. Also clean up tracking where access to lot has been done. If going to use as an access a stabilized construction exit will be required. Will re-inspect on 11/30/09AM.
Site Preparation11/25/200911/25/200911/25/2009PPART
DetailsMike Jordan
Needs to post ESC sign. Conc washout in place. Vebal c/n to RP.
Random Inspection11/24/200911/24/200911/24/2009PPASS
DetailsTom Arcoraci