Site Final | 11/30/2009 | 11/30/2009 | 11/30/2009 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 11/30/2009 | 11/23/2009 | 11/30/2009 | A | PASS |
Jim Sly
|
|
|
|
Site Final | 11/30/2009 | 11/30/2009 | 11/30/2009 | A | PASS |
Jim Sly
|
|
|
|
Site Final | 11/30/2009 | 11/23/2009 | 11/30/2009 | A | PASS |
Jim Sly
|
|
|
|
Random Inspection | 11/23/2009 | 11/23/2009 | 11/23/2009 | A | PASS |
Bill VanDegrift
|
|
|
|
Random Inspection | 11/5/2009 | 11/5/2009 | 11/5/2009 | P | PASS |
Jim Sly
|
|
|
Ray phone
|
Random Inspection | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PASS |
Jim Sly
|
|
|
Ray phone
|
Site Preparation | 10/21/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Jim Sly
|
|
|
|
BMP Violation | 10/20/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | CANC |
Jim Sly
|
|
|
|
Site Preparation | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | FAIL |
Jim Sly
|
|
|
Pend Prev C/N.......
|
Site Preparation | 10/20/2009 | 10/20/2009 | 10/20/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Remove all parts of stock pile off of the sidewalk. Once removed re-install sediment barrier at the front of lot per manufactures specifications. Will re-inspect on 10/21/09 PM.
|