General Inspection | 4/27/2011 | 4/27/2011 | 4/27/2011 | | DONE |
Clint A Smith
|
|
|
Permi finalled.
|
DOC - Permit Finaled | 4/27/2011 | 4/27/2011 | 4/27/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/21/2011 | 3/21/2011 | 3/21/2011 | | DONE |
Clint A Smith
|
|
|
Waiting on vegitation along the hillside.
|
General Inspection | 2/17/2011 | 2/17/2011 | 2/17/2011 | | NR |
Clint A Smith
|
|
|
|
General Inspection | 1/17/2011 | 1/17/2011 | 1/18/2011 | | CANC |
Steven Webb
|
|
|
holiday
|
General Inspection | 12/17/2010 | 12/17/2010 | 12/17/2010 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/27/2010 | 8/31/2010 | 9/2/2010 | A | DONE |
Clint A Smith
|
|
|
Per the approved plan, final stabilization will be achieved by landscaping and seed, tachifier and mulch. Agreed by the contractor/ RP. ALso instructed the RP to have on had sediment barriers to be installed prior to any storm events.
|
General Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 | | CANC |
Steven Webb
|
|
|
|
BMP Violation | 9/1/2009 | 9/4/2009 | 9/4/2009 | A | PASS |
Eric Strole
|
|
|
bmp's in place.
|
Conference | 9/2/2009 | 9/2/2009 | 9/2/2009 | A | DONE |
Eric Strole
|
|
|
met with rp to go over where the silt fence needs to be on project.
|
Site Preparation | 9/1/2009 | 9/1/2009 | 9/2/2009 | | PART |
Eric Strole
|
|
|
left written & verbal correction with rp to install a sediment barrier on east side of project behind house where work is being done by 9-03-09 pm. will reinspect 9-04-09 am.
|