Site Final | 3/18/2010 | 3/18/2010 | 3/18/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 3/9/2010 | 3/10/2010 | 3/10/2010 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 3/9/2010 | 3/9/2010 | 3/9/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Protect storm drain inlet at the access off of Franklin to the West of project area. Willl re-inspect on 3/10/10AM.
|
Site Preparation | 2/25/2010 | 2/25/2010 | 2/25/2010 | A | PASS |
Mike Jordan
|
|
|
ESC prmit sign posted. Site is clean.
|
Site Preparation | 2/10/2010 | 2/10/2010 | 2/10/2010 | | FAIL |
Alan Hauser
|
|
|
|