General Inspection ESC | 6/10/2010 | 6/10/2010 | 6/10/2010 | | DONE |
Clint A Smith
|
|
|
All work compleeted.
|
DOC - Permit Finaled | 6/10/2010 | 6/10/2010 | 6/10/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection ESC | 5/26/2010 | 5/26/2010 | 5/26/2010 | | CANC |
Steven Webb
|
|
|
|
Site Preparation | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | PASS |
Troy James
|
|
|
work for poject has started at 20th st, will be at camel back park in a couple months, erosion control will be inspected by city public works until work through city park
|
Site Preparation | 9/4/2009 | 9/4/2009 | 9/4/2009 | | PART |
Troy James
|
|
|
talked with jesse and he will email me info on project so I can verify proper esc requirements
|