Site Final | 11/18/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 11/18/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 9/23/2010 | 9/23/2010 | 9/23/2010 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 8/5/2010 | 8/5/2010 | 8/5/2010 | P | PART |
Clint A Smith
|
|
|
Verbal to RP: after back fill, relocate the porter pottie to the back of walk.
|
Random Inspection | 7/20/2010 | 7/20/2010 | 7/20/2010 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 7/19/2010 | 7/19/2010 | 7/19/2010 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 7/13/2010 | 7/14/2010 | 7/14/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/13/2010 | 7/13/2010 | 7/13/2010 | | CANC |
Clint A Smith
|
|
|
|