General Inspection | 12/17/2010 | 12/17/2010 | 12/17/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 12/17/2010 | 12/17/2010 | 12/17/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 | | CANC |
Steven Webb
|
|
|
|
BMP Violation | 10/26/2009 | 10/27/2009 | 10/27/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 10/26/2009 | 10/26/2009 | 10/26/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal correction to RP via phone call: Install a sediement barrier along the front slopetowards the court. Will allow them to pull the sediment barrier that is at the back of lot for the needed protection at the front of lot. Will re-inspect on 10/27/09 PM.
|