Site Final | 9/2/2010 | 9/2/2010 | 9/2/2010 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/2/2010 | 9/2/2010 | 9/2/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/5/2010 | 8/5/2010 | 8/5/2010 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 8/4/2010 | 8/4/2010 | 8/4/2010 | A | PASS |
Mike Jordan
|
|
|
All issues were rsolved.
|
General Inspection | 8/2/2010 | 8/2/2010 | 8/2/2010 | P | PART |
Mike Jordan
|
|
|
Sweep all silts from hard surfaces, remove all concrete debries. Correction notice was posted.
|
Random Inspection | 7/14/2010 | 7/14/2010 | 7/14/2010 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 7/13/2010 | 7/13/2010 | 7/13/2010 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 7/8/2010 | 7/8/2010 | 7/8/2010 | | NR |
Clint A Smith
|
|
|
CBH has not begun the developement of the lot.
|