Site Final | 4/19/2010 | 4/20/2010 | 4/20/2010 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 4/20/2010 | 4/20/2010 | 4/20/2010 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 2/17/2010 | 2/17/2010 | 2/17/2010 | P | PASS |
Jim Sly
|
|
|
Craig phone
|
General Inspection | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | FAIL |
Jack Frank
|
|
|
needs to clean hard surfaces
|
Site Preparation | 11/20/2009 | 11/20/2009 | 11/20/2009 | P | PART |
Jim Sly
|
|
|
Talked with RP about Concrete wash out. Pump truck to recirculate back into truck and washout off site, or provide approved pit.
|