General Inspection | 12/20/2010 | 12/20/2010 | 12/20/2010 | | DONE |
Clint A Smith
|
|
|
permit finalled
|
DOC - Permit Finaled | 12/20/2010 | 12/20/2010 | 12/20/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 | | CANC |
Steven Webb
|
|
|
|
General Inspection | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | PASS |
Bob Reichert
|
|
|
|
General Inspection | 4/12/2010 | 4/12/2010 | 4/12/2010 | P | PASS |
Bob Reichert
|
|
|
|
Random Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 | P | PASS |
Dixie Fellows
|
|
|
zane is the contact..site ok
|
General Inspection | 12/30/2009 | 12/30/2009 | 12/30/2009 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | PASS |
Dixie Fellows
|
|
|
zane is the contact
|
Site Preparation | 11/17/2009 | 11/17/2009 | 11/17/2009 | P | PART |
Tony Young
|
|
|
wip on BMPs,, daily clean up
|
BMP Violation | 11/13/2009 | 11/16/2009 | 11/16/2009 | A | PASS |
Clint A Smith
|
|
|
Installing a sediment barrier on the stock pile.
|
Site Preparation | 11/16/2009 | 11/16/2009 | 11/16/2009 | | CANC |
Steven Webb
|
|
|
Duplicate inspection
|
Site Preparation | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal correction to RP: 1. Install a sediment barrier along the front of the stock pile. 2. clean up all sediment and debris off of all hard surfaces. 3. Prior to any concrete pours to provide a concrete wash out it that is lined. Will re-inspect on 11/16/09 AM.
|