Site Final | 6/30/2010 | 6/30/2010 | 6/30/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 6/22/2010 | 6/22/2010 | 6/22/2010 | A | PASS |
Bill VanDegrift
|
|
|
|
General Inspection | 6/7/2010 | 6/8/2010 | 6/8/2010 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 | | CANC |
Steven Webb
|
|
|
|
Random Inspection | 3/3/2010 | 3/3/2010 | 3/3/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 | A | PASS |
Troy James
|
|
|
RP currently removing dirt from sidewalk and picking up trash off site
|
Random Inspection | 2/22/2010 | 2/22/2010 | 2/22/2010 | A | PART |
Bill VanDegrift
|
|
|
cleaning up trash pile
|
Tracking Control | 1/14/2010 | 1/15/2010 | 1/15/2010 | A | PART |
Clint A Smith
|
|
|
Need to clean up foot traffic tracking off of hard surface on a daily basis.
|
Site Preparation | 1/15/2010 | 1/15/2010 | 1/15/2010 | | CANC |
Clint A Smith
|
|
|
|
General Inspection | 1/14/2010 | 1/14/2010 | 1/14/2010 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: 1. Clean up all sediment off of the hard surfaces on a daily basis. 2. Clean D.I. by the end of the day. Will re-inspect on 1/15/10.
|
General Inspection | 1/13/2010 | 1/13/2010 | 1/13/2010 | P | PASS |
Bob Reichert
|
|
|
see 301 comments
|
Random Inspection | 1/12/2010 | 1/13/2010 | 1/13/2010 | A | PASS |
Jim Storey
|
|
|
dirt has been removed from sidewalk, cement contractor will clean at end of day
|
Site Preparation | 1/12/2010 | 1/13/2010 | 1/13/2010 | A | FAIL |
Troy James
|
|
|
dirt has been removed from sidewalk, cement contractor will clean at end of day need sediment control at back of property from dirt stockpiles, called and left message to bryan to call me back
|
Random Inspection | 1/12/2010 | 1/12/2010 | 1/13/2010 | P | NR |
Jim Storey
|
|
|
|
Site Preparation | 1/11/2010 | 1/12/2010 | 1/12/2010 | P | PART |
Troy James
|
|
|
talked to bryan on phone, he says cement contractor is removing dirt from sidewalk, contractor will be on site in the morning to verify work is complete
|
Site Preparation | 1/11/2010 | 1/11/2010 | 1/11/2010 | P | FAIL |
Troy James
|
|
|
left message with bryan to remove dirt from sidewalk and to have him give me a call to complete site prep for esc
|