General Inspection | 12/21/2010 | 12/21/2010 | 12/21/2010 | | PASS |
Clint A Smith
|
|
|
Permit was finaled.
|
DOC - Permit Finaled | 12/21/2010 | 12/21/2010 | 12/21/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 | | CANC |
Steven Webb
|
|
|
|
General Inspection | 4/15/2010 | 4/15/2010 | 4/15/2010 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 4/12/2010 | 4/12/2010 | 4/13/2010 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 4/6/2010 | 4/6/2010 | 4/6/2010 | P | PASS |
Bob Reichert
|
|
|
|
Tracking Control | 3/23/2010 | 3/24/2010 | 3/24/2010 | P | PASS |
Dixie Fellows
|
|
|
called erin about need a garbage container and cleaning up the trash on the job
|
Random Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | FAIL |
Dixie Fellows
|
|
|
called erin and talked to him about needing a garbage container and cleaning up the trash on the job...###-####
|
General Inspection | 3/9/2010 | 3/9/2010 | 3/12/2010 | P | PART |
Tony Young
|
|
|
work in progress, daily clean up
|
BMP Violation | 2/12/2010 | 2/16/2010 | 2/16/2010 | P | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 2/12/2010 | 2/12/2010 | 2/12/2010 | P | FAIL |
Clint A Smith
|
|
|
VErbal to RP: Reistall sediment barrier per industry standards. Did not find any evidence of where run off had occured off site. Site has a good dense vegitative buffer plus a sediment barrier also. Will re-inspect on 2/16/10 pm
|
Site Preparation | 1/19/2010 | 1/19/2010 | 1/19/2010 | | NR |
Clint A Smith
|
|
|
|