DOC - Permit Finaled | | | 2/19/2010 | | DONE |
|
|
|
per clint
|
Site Preparation | 11/27/2009 | 11/27/2009 | 11/27/2009 | | CANC |
Clint A Smith
|
|
|
completed.
|
BMP Violation | 11/24/2009 | 11/25/2009 | 11/25/2009 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 11/23/2009 | 11/24/2009 | 11/24/2009 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice to RP: 1. Vac up all non storm water that is collected within the back of the building. 2. Protect storm drain with an approved storm drain inlet protection. 3. Remove concrete concrete washout pit. Failure to comply will result in a stop work order. Will re-inspect on 11/25/09AM
|
Site Preparation | 11/23/2009 | 11/23/2009 | 11/23/2009 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Relocate ESC sign where it is visable from Broadway st. Protect the storm drain located just to the south of the auger. Was told that all excess concrete and clean out will be taken back to the batch plant. Will re-inspect on 11/24/09AM.
|