Site Final | 2/25/2010 | 2/25/2010 | 2/25/2010 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 2/25/2010 | 2/25/2010 | 2/25/2010 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 2/1/2010 | 2/1/2010 | 2/1/2010 | P | PASS |
Doug A Poedy
|
|
|
|
Site Preparation | 12/21/2009 | 12/21/2009 | 12/21/2009 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 12/15/2009 | 12/16/2009 | 12/16/2009 | P | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 12/15/2009 | 12/15/2009 | 12/15/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a sediment barrier along the Dewey side of project to capture the turbid run off into the street. Also post the ESC sign at the front of project where it is visable from the street. Will re-inspect on 12/16/09PM
|