Site Final | 5/18/2010 | 5/19/2010 | 5/19/2010 | A | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 5/19/2010 | 5/19/2010 | 5/19/2010 | P | PASS |
Tony Young
|
|
|
|
Site Final | 5/17/2010 | 5/18/2010 | 5/18/2010 | A | FAIL |
Clint A Smith
|
|
|
Must install landscaping on the project lot to achieve a pass on a site final inspection.
|
General Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 3/5/2010 | 3/5/2010 | 3/8/2010 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 2/10/2010 | 2/10/2010 | 2/10/2010 | | CANC |
Steven Webb
|
|
|
Site Prep. passed on 2-5-10 by inspector 415
|
Site Preparation | 2/4/2010 | 2/4/2010 | 2/8/2010 | P | DONE |
Jim Storey
|
|
|
passed by 415 on 2/3/10
|
Site Preparation | 2/3/2010 | 2/3/2010 | 2/4/2010 | P | PASS |
Tony Young
|
|
|
Johnaton Phone #: ###-####
|