Site Final | 6/3/2010 | 6/3/2010 | 6/3/2010 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/3/2010 | 6/3/2010 | 6/3/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization has been completed.
|
Site Preparation | 1/28/2010 | 1/29/2010 | 1/29/2010 | A | PART |
Jim Sly
|
|
|
Lance phone ###-#### Talked to Lance RP......Need to install waddle between disturbed soil and side walk.
|
General Inspection | 1/29/2010 | 1/29/2010 | 1/29/2010 | A | PASS |
Jack Frank
|
|
|
|
BMP Violation | 1/27/2010 | 1/28/2010 | 1/28/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 1/26/2010 | 1/26/2010 | 1/27/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal message to RP: 1. CLean up all hard surface of all sediment and debris. 2. Protect the storm drain inlet to the north of project area. Will re-inspect on 1/28/10 am.
|