Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC10-00040
StatusFinaled
Name MIKE BEESON
Site Address 5100 W OVERLAND RD
Project NameHillcrest Shopping Center.
Customer Number 
ePlanReview 
Description
Demo of building and add of landscaping SEE ATTACHED CONDITIONS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/20/20115/20/20115/20/2011APASS
DetailsClint A Smith
DOC - Permit Finaled5/20/20115/20/20115/20/2011PPASS
DetailsClint A Smith
Site Preparation3/30/20114/6/20114/6/2011APART
DetailsClint A Smith
Verbal to Assistant PM:
Clean up back section of parking lot, remove the sediment barrier. Contact the city for a Site Final inspection once the disturbed area has acheived a uniform coverage of vegitation on all distubed area.
Tracking Control4/1/20114/4/20114/4/2011APASS
DetailsClint A Smith
Complaint Inspection4/1/20114/1/20114/1/2011PFAIL
DetailsClint A Smith
Message to RP & Verbal to Project Manager:
Correction Notice:
Clean up all sediment and debris off of all hard surfaces surrounding the project area. Failure to comply by 4/1/2011PM will result in a Stop Work Order. Will re-inspect on 4/4/2011am.
General Inspection3/30/20113/30/20113/30/2011PPASS
DetailsTom Arcoraci
see last inspection
General Inspection3/30/20113/30/20113/30/2011 PART
DetailsClint A Smith
They are plannig on hydro-seeding and have it complete by next week. Will re-inspect on 4/6/2011
General Inspection1/28/20111/28/20111/28/2011PPASS
DetailsTom Arcoraci
Random Inspection12/17/201012/17/201012/17/2010PPASS
DetailsSteven Webb
Hardsurfaces have been cleaned, RP to provide more day-to-day control to prevent this type of mechanical erosion or elevated enforcement will occur.
BMP Violation12/16/201012/17/201012/17/2010APASS
DetailsClint A Smith
General Inspection12/16/201012/16/201012/16/2010AFAIL
DetailsClint A Smith
Clean up the hard surfaces outside of the project area to eastside. Also maintain all storm drain inlets. Will follow up on 12/17/2010am.
Random Inspection12/10/201012/10/201012/10/2010PPASS
DetailsTom Arcoraci
Random Inspection11/18/201011/19/201011/19/2010APASS
DetailsTom Arcoraci
Random Inspection11/17/201011/18/201011/18/2010PPASS
DetailsTom Arcoraci
BMP Violation10/4/201010/6/201010/6/2010PPASS
DetailsClint A Smith
General Inspection10/6/201010/7/201010/6/2010PCANC
DetailsTom Arcoraci
General Inspection9/28/201010/4/201010/4/2010APART
DetailsClint A Smith
Verbal to RP:
Place weighted non erodible materal on top of the wattle and gator guard that are placed on the hard surfaces. Sweep all hard surfaces within the project area where thereare any sediment deposits. Install a stabilized construction exit with deliniators at the exit of project area by the job trailer. Will re-inspect 10/6/10PM.
Random Inspection9/28/20109/28/20109/28/2010PFAIL
DetailsSteven Webb
Verbal to RP (Bill S.) Site is in need or attention including removal of materials outside the fence and sweeping, protect stormdrains including drop inlets outside the fence on the north, north of the new seepage bed. Irrigation lines still not install nor is the stockpiled soils graded out. Complete all maintanence by the end of the week 10/3 or further enforcement will occur. Will re-inspect on 10/4.
Random Inspection8/23/20108/23/20108/24/2010PPASS
DetailsTom Arcoraci
General Inspection6/28/20106/28/20106/28/2010PPASS
DetailsSteven Webb
Drop inlets protected, topsoil material staged ready to spread when elevation is correct. Sign posted at main entrance.
Random Inspection6/23/20106/23/20106/23/2010PPASS
DetailsTom Arcoraci
Random Inspection6/22/20106/22/20106/22/2010PPASS
DetailsJim Storey
Random Inspection6/22/20106/22/20106/22/2010APASS
DetailsJim Storey
General Inspection6/16/20106/16/20106/16/2010PPART
DetailsTom Arcoraci
sign posted
General Inspection6/15/20106/15/20106/15/2010PPART
DetailsSteven Webb
Verbal to RP: Need to post yellow sign at main construction entrance, double protect d.inlet at the north side of the project. Reviewed stabilization of project. Upon achieving final elevation 10 inches of top soil and seed broadcasted on site. Area will be fully sprinkled to achieve growth.
Site Preparation4/27/20104/27/20104/28/2010 PASS
DetailsClint A Smith