Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC10-00067
StatusFinaled
Name JAMES LARKIN
Site Address 647 S BLUE PINE LN
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Per attached conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/21/20111/21/20111/21/2011PDONE
DetailsMike Jordan
DOC - Permit Finaled1/21/20111/21/20111/21/2011PPASS
DetailsMike Jordan
Final stabalization has been completed.
Random Inspection1/11/20111/11/20111/11/2011PPASS
DetailsMike Jordan
Random Inspection12/3/201012/3/201012/3/2010PPASS
DetailsMike Jordan
Random Inspection11/17/201011/17/201011/17/2010PPASS
DetailsMike Jordan
Random Inspection7/23/20107/23/20107/23/2010PPASS
DetailsMike Jordan
Random Inspection7/7/20107/7/20107/7/2010APASS
DetailsMike Jordan
BMP Violation6/9/20106/9/20106/9/2010PPASS
DetailsMike Jordan
Landscapping work has been in progress. Almost complete. Noted daily cleaning and sweeping of all hardsurfaces. Site condotions at this time are good.
Random Inspection5/25/20105/25/20105/25/2010APART
DetailsMike Jordan
ESC permit sign posted. BMP's in place. General site conditions ok. Needs to sweep silts off of hard surfaces. Verbal to RP.
Random Inspection5/11/20105/11/20105/11/2010PPASS
DetailsMike Jordan
BMP Violation5/4/20105/4/20105/5/2010PPASS
DetailsMike Jordan
Lifted stop work, ESC issues have been resolved.
BMP Violation5/4/20105/4/20105/4/2010AFAIL
DetailsMike Jordan
Clean up still in progress. Rescheduled for this afternoon.
BMP Violation5/3/20105/3/20105/3/2010PFAIL
DetailsMike Jordan
Clean up has not been completed. Stop work order has been issued. RP was notified. Stop work will be lifted when all ESC issues have been resolved.
BMP Violation4/30/20104/30/20104/30/2010PPART
DetailsMike Jordan
Work in progress on cleanup.
General Inspection4/26/20104/26/20104/26/2010PFAIL
DetailsMike Jordan
Needs to sweep silts from all hard surfaces, clwan up all blowable trash and empty overflowing bin. Verbal c/n given to RP.
BMP Violation4/8/20104/8/20104/8/2010PPART
DetailsMike Jordan
Work in progress on cleanup.
Random Inspection4/6/20104/6/20104/6/2010PPART
DetailsMike Jordan
Needs to sweep all sediments from hard surfaces and sweep trackout. RP was given verbal c/n.
Random Inspection4/5/20104/5/20104/5/2010PPASS
DetailsMike Jordan
Random Inspection4/5/20104/5/20104/5/2010PPASS
DetailsMike Jordan
Random Inspection3/30/20103/30/20103/30/2010PPASS
DetailsMike Jordan
Tracking Control3/30/20103/30/20103/30/2010APASS
DetailsMike Jordan
Random Inspection3/29/20103/29/20103/29/2010PPASS
DetailsMike Jordan
Random Inspection3/26/20103/26/20103/26/2010PPASS
DetailsMike Jordan
Tracking Control3/19/20103/19/20103/19/2010PPASS
DetailsMike Jordan
Tracking Control3/15/20103/17/20103/17/2010APASS
DetailsClint A Smith
Tracking Control3/15/20103/15/20103/15/2010PFAIL
DetailsClint A Smith
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
Tracking Control3/10/20103/10/20103/10/2010APART
DetailsMike Jordan
Minor trackout noted. Contacted RP, will get cleaned up.
Tracking Control3/9/20103/9/20103/9/2010ACANC
DetailsMike Jordan
BMP Violation3/8/20103/8/20103/8/2010PPART
DetailsMike Jordan
BAckfill operations in progress. Sediment controls in place. Will need to sweep and end of day. Noted no trackout at this time.
Site Preparation3/4/20103/4/20103/5/2010 CANC
DetailsSteven Webb
already done
BMP Violation3/4/20103/4/20103/4/2010PCANC
DetailsMike Jordan
Site Preparation3/4/20103/4/20103/4/2010 PART
DetailsSteven Webb
Addressed concrete washout and sediment controls- throughout project.
Random Inspection3/3/20103/3/20103/3/2010AFAIL
DetailsMike Jordan
Needs to sweep all silts off of hard surfaces. RP was notified.
Random Inspection3/1/20103/1/20103/1/2010PPASS
DetailsMike Jordan
Site Preparation2/25/20102/26/20102/26/2010PPASS
DetailsMike Jordan
ESC permit signs posted. BMP's in place. Noted to excavation contractor to sweep at end of work day. Also requested to RP to add additional waddels to stockpiles in parkinglot area.
Site Preparation2/25/20102/25/20102/25/2010PCANC
DetailsMike Jordan