Permit Information
Permit NumberESC10-00068
StatusFinaled
Name JAMES LARKIN
Site Address 651 S BLUE PINE LN
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Per attached conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/19/20108/19/20108/19/2010PDONE
DetailsMike Jordan
DOC - Permit Finaled8/19/20108/19/20108/19/2010PPASS
DetailsMike Jordan
Final stabalization has been completed.
Random Inspection7/23/20107/23/20107/23/2010PPASS
DetailsMike Jordan
Random Inspection7/7/20107/7/20107/7/2010APASS
DetailsMike Jordan
BMP Violation6/9/20106/9/20106/9/2010PPASS
DetailsMike Jordan
Landscapping work has been in progress. Almost complete. Noted daily cleaning and sweeping of all hardsurfaces. Site condotions at this time are good.
Random Inspection5/25/20105/25/20105/25/2010APART
DetailsMike Jordan
ESC permit sign posted. BMP's in place. General site conditions ok. Needs to sweep silts off of hard surfaces. Verbal to RP.
BMP Violation4/28/20104/28/20104/28/2010PPART
DetailsMike Jordan
Silts have been swept, clean up on blowable trash and empting bins is in progress.
General Inspection4/26/20104/26/20104/26/2010PFAIL
DetailsMike Jordan
Needs to sweep all silts from hard surfaces, clean up all blowable trash and empty overflowing bin. Verbal c/n given to RP.
Random Inspection4/6/20104/6/20104/6/2010PPART
DetailsMike Jordan
Needs to sweep all sediments from hard surfaces and sweep trackout. RP was given verbal c/n.
Random Inspection4/5/20104/5/20104/5/2010PPASS
DetailsMike Jordan
Random Inspection3/30/20103/30/20103/30/2010PPASS
DetailsMike Jordan
Tracking Control3/30/20103/30/20103/30/2010APASS
DetailsMike Jordan
Random Inspection3/29/20103/29/20103/29/2010PPASS
DetailsMike Jordan
Random Inspection3/26/20103/26/20103/26/2010PPASS
DetailsMike Jordan
Tracking Control3/19/20103/19/20103/19/2010PPASS
DetailsMike Jordan
Tracking Control3/15/20103/17/20103/17/2010APASS
DetailsClint A Smith
Tracking Control3/15/20103/15/20103/15/2010PFAIL
DetailsClint A Smith
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
Tracking Control3/10/20103/10/20103/10/2010APART
DetailsMike Jordan
Noted minor trackout at this time. Contacted RP and will get cleaned up.
Tracking Control3/9/20103/9/20103/9/2010ACANC
DetailsMike Jordan
BMP Violation3/8/20103/8/20103/8/2010PPART
DetailsMike Jordan
Backfilling operations in progress. Sediment controls in place. Will need to sweep and end of day. No trackout at this time.
Site Preparation3/4/20103/4/20103/5/2010 CANC
DetailsSteven Webb
already done
BMP Violation3/4/20103/4/20103/4/2010PCANC
DetailsMike Jordan
Site Preparation3/4/20103/4/20103/4/2010 PART
DetailsSteven Webb
concrete washout and sediment controls expected throughout.
Random Inspection3/3/20103/3/20103/3/2010AFAIL
DetailsMike Jordan
Needs to sweep all silts off of hard surfaces. Verbal c/n given to RP.
Random Inspection3/1/20103/1/20103/1/2010PPASS
DetailsMike Jordan
Site Preparation2/25/20102/26/20102/26/2010PPASS
DetailsMike Jordan
ESC permit sign posted. BMP's inplace. Noted to RP to have excavation contractor sweep at end of work today. Also add additional waddle around stockpile in parking area.
Site Preparation2/25/20102/25/20102/25/2010PCANC
DetailsMike Jordan