Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC10-00071
StatusFinaled
Name JAMES LARKIN
Site Address 659 S BLUE PINE LN
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Per approved conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/14/201010/14/201010/14/2010ADONE
DetailsMike Jordan
DOC - Permit Finaled10/14/201010/14/201010/14/2010PPASS
DetailsMike Jordan
Random Inspection7/23/20107/23/20107/23/2010PPASS
DetailsMike Jordan
Random Inspection7/7/20107/7/20107/7/2010APASS
DetailsMike Jordan
BMP Violation6/9/20106/9/20106/9/2010PPASS
DetailsMike Jordan
Landscapping work has been in progress. Almost complete. Noted daily cleaning and sweeping of all hardsurfaces. Site condotions at this time are good.
Random Inspection5/25/20105/25/20105/25/2010APART
DetailsMike Jordan
ESC permit sign posted. BMP's in place. General site conditions ok. Needs to sweep silts off of hard surfaces. Verbal to RP.
Random Inspection5/11/20105/11/20105/11/2010PPASS
DetailsMike Jordan
BMP Violation5/4/20105/4/20105/5/2010PPASS
DetailsMike Jordan
Stop work lifted. ESC issues resolved.
BMP Violation5/4/20105/4/20105/4/2010AFAIL
DetailsMike Jordan
Clean up still in progress. Rescheduled for inspection this afternoon.
BMP Violation5/3/20105/3/20105/3/2010PFAIL
DetailsMike Jordan
Clean up has not been completed. A Stop work order has been issued. RP has been notified. Will lift stop work when all ESC issues have been resolved.
BMP Violation4/30/20104/30/20104/30/2010PCANC
DetailsMike Jordan
Work in progress on cleanup.
General Inspection4/26/20104/26/20104/26/2010AFAIL
DetailsMike Jordan
Needs to sweep all hard surfaces of silts, clean all blowable trash and empty overflowing bins. Verbal c/n to RP.
BMP Violation4/8/20104/8/20104/8/2010PPART
DetailsMike Jordan
Work in progress on cleanup.
Random Inspection4/6/20104/6/20104/6/2010PPART
DetailsMike Jordan
Needs to sweep all sediments from hard surfaces and sweep trackout. RP was given verbal c/n.
Random Inspection4/5/20104/5/20104/5/2010PPASS
DetailsMike Jordan
Random Inspection3/30/20103/30/20103/30/2010PPASS
DetailsMike Jordan
Tracking Control3/30/20103/30/20103/30/2010APASS
DetailsMike Jordan
Random Inspection3/29/20103/29/20103/29/2010PPASS
DetailsMike Jordan
Random Inspection3/26/20103/26/20103/26/2010PPASS
DetailsMike Jordan
Tracking Control3/19/20103/19/20103/19/2010PPASS
DetailsMike Jordan
Tracking Control3/15/20103/17/20103/17/2010APASS
DetailsClint A Smith
Tracking Control3/15/20103/15/20103/15/2010PFAIL
DetailsClint A Smith
Clean up all sediment and debris off of all hardsurfaces. Clean up all tracking also. Will re-inspect on 3/17/10AM.
Tracking Control3/10/20103/10/20103/10/2010APART
DetailsMike Jordan
Noted minimal trackout at this time. Contacted RP and will get cleaned up.
Tracking Control3/9/20103/9/20103/9/2010PCANC
DetailsMike Jordan
BMP Violation3/8/20103/8/20103/8/2010PPART
DetailsMike Jordan
Backfill operations in progress. Sediment controls in place. Will need to sweep at end of day. No trackout at this time.
Site Preparation3/4/20103/4/20103/5/2010 CANC
DetailsSteven Webb
already done
BMP Violation3/4/20103/4/20103/4/2010PCANC
DetailsMike Jordan
Site Preparation3/4/20103/4/20103/4/2010 PART
DetailsSteven Webb
Washout maintenance, sediment barriers and drop inlet protected.
Random Inspection3/3/20103/3/20103/3/2010AFAIL
DetailsMike Jordan
Needs to sweep all hard surfaces of silts. Verbal c/n issued to RP.
Random Inspection3/1/20103/1/20103/1/2010PPASS
DetailsMike Jordan