Site Final | 4/28/2010 | 4/28/2010 | 4/28/2010 | P | PASS |
Jim Sly
|
|
|
Mike phone
|
Random Inspection | 3/24/2010 | 3/25/2010 | 3/25/2010 | A | PASS |
Jim Sly
|
|
|
Mike phone
|
General Inspection | 3/9/2010 | 3/12/2010 | 3/12/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/9/2010 | 3/9/2010 | 3/9/2010 | P | PASS |
Jim Sly
|
|
|
Mike phone
|
Site Preparation | 3/9/2010 | 3/9/2010 | 3/9/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all hard surfaces of sediment and debris. Also container all trash debris into the provided trash collection containers. Move the porter pottie off of the sidewalk. Will re-inspect on 3/12/10AM.
|