Site Final | 5/21/2010 | 5/21/2010 | 5/21/2010 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 4/19/2010 | 4/19/2010 | 4/19/2010 | P | PASS |
Jim Sly
|
|
|
Mike phone
|
BMP Violation | 3/30/2010 | 4/2/2010 | 4/2/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: stay on top of sweeping and also to install perimeter protection on all lot that have over a 2% grade slope.
|
Site Preparation | 3/30/2010 | 3/30/2010 | 3/30/2010 | | CANC |
Steven Webb
|
|
|
Inspection performed on 3/3/10 by Insp. 460
|
BMP Violation | 3/30/2010 | 3/30/2010 | 3/30/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to Super (Larry): Remove all storm drain protection the is external (Wattle Sections). The protection is not being maintained and is ripping apart and straw is pollutinfg the storm drain not allowing the "Witches Hats" to work correctly. Will re-inspect on 4/2/10.
|
Site Preparation | 3/30/2010 | 3/30/2010 | 3/30/2010 | | CANC |
Steven Webb
|
|
|
Passed by Insp.316 on 3/29/10
|
Site Preparation | 3/29/2010 | 3/29/2010 | 3/29/2010 | P | PASS |
Jim Sly
|
|
|
Mike phone
|