Site Final | 5/24/2010 | 5/24/2010 | 5/24/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 5/14/2010 | 5/14/2010 | 5/14/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/20/2010 | 4/20/2010 | 4/20/2010 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 4/19/2010 | 4/19/2010 | 4/19/2010 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 4/2/2010 | 4/2/2010 | 4/2/2010 | A | PASS |
Troy James
|
|
|
talked to rp about concrete washout, he said excavator will did pit when footings are excavated, sign is posted
|
Site Preparation | 3/22/2010 | 3/22/2010 | 3/22/2010 | | PART |
Troy James
|
|
|
talked to rp, work will not be performed for couple more weeks, informed rp to call me before work proceeds fo site visit
|