DOC - Permit Finaled | 12/23/2010 | 12/23/2010 | 12/23/2010 | A | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 12/23/2010 | 12/23/2010 | 12/23/2010 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 5/17/2010 | 5/17/2010 | 5/17/2010 | P | PART |
Tony Young
|
|
|
|
Random Inspection | 5/14/2010 | 5/14/2010 | 5/14/2010 | P | PART |
Tony Young
|
|
|
daily clean up
|
General Inspection | 4/26/2010 | 4/26/2010 | 4/26/2010 | P | PART |
Tony Young
|
|
|
daily clean
|
Site Preparation | 4/6/2010 | 4/6/2010 | 4/6/2010 | P | PART |
Tony Young
|
|
|
daily clean up,, BMP work in progress
|
BMP Violation | 3/31/2010 | 4/2/2010 | 4/2/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/31/2010 | 3/31/2010 | 3/31/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP & Excavator: Clean up all sediment off the hard surfaces by the end of the day and or prior to any rain event. Also install sediment barrier at the lot at bottom of the hill where staging stock piles. Once area is not in use it is a requirement to re-stabilize the the disturbed area of the lot. Will re-inspect on 4/2/10.
|
Site Preparation | 3/31/2010 | 3/31/2010 | 3/31/2010 | | CANC |
Steven Webb
|
|
|
duplicate
|