Site Final | 5/25/2010 | 5/26/2010 | 5/26/2010 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 5/26/2010 | 5/26/2010 | 5/26/2010 | P | PASS |
Tony Young
|
|
|
|
Random Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 | P | PASS |
Dixie Fellows
|
|
|
site clean
|
General Inspection | 5/10/2010 | 5/10/2010 | 5/10/2010 | P | PASS |
Dixie Fellows
|
|
|
site clean
|
Site Preparation | 4/8/2010 | 4/8/2010 | 4/8/2010 | | CANC |
Steven Webb
|
|
|
Passed by inspector 415 on 4/6/10
|
Site Preparation | 4/5/2010 | 4/5/2010 | 4/6/2010 | P | PASS |
Tony Young
|
|
|
|
BMP Violation | 4/2/2010 | 4/5/2010 | 4/5/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 4/2/2010 | 4/2/2010 | 4/2/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a seidment barrier along the from of lot where stockpile of footing is. Will re-inspect on 4/5/10AM.
|