Site Final | 12/23/2010 | 12/23/2010 | 12/23/2010 | P | PASS |
Jack Frank
|
|
|
|
General Inspection | 12/23/2010 | 12/23/2010 | 12/23/2010 | | CANC |
Jack Frank
|
|
|
|
Random Inspection | 7/13/2010 | 7/14/2010 | 7/14/2010 | A | PART |
Jim Sly
|
|
|
Verbal....RP.....Excavators to clean up better....
|
Random Inspection | 6/3/2010 | 6/3/2010 | 6/3/2010 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 6/2/2010 | 6/2/2010 | 6/2/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
BMP Violation | 5/18/2010 | 5/20/2010 | 5/20/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/17/2010 | 5/18/2010 | 5/18/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Provide a washout pit for all non storm water pollutants. Also relocate stockpile from sidewalk or install a sediment barrier along the back of sidewalk. Will re-inspect on 5/20/10pm.
|
Site Preparation | 5/17/2010 | 5/17/2010 | 5/17/2010 | P | CANC |
Jim Sly
|
|
|
re-sched.......
|
Site Preparation | 5/14/2010 | 5/14/2010 | 5/14/2010 | | PART |
Jim Johnson
|
|
|
hole dug for basement no foundation form,s installed signage posted
|